Yichengxing Environment Engineering Co., Ltd. in Xinjiang is a professional m...
产品Price Negotiable
最小起订Quantity: 供货总Quantity:
High-rise column advertisement production, building signages, and facade lighting projects! For the actual construction of high columns, equip with the necessary machinery and equipment, skilled technical workers, and strictly adhere to the contract documents. Based on the principle of resource optimization, select and configure a complete set of professional machinery and detection instruments according to the overall construction plan and detailed construction methods for this project. Provide an adequate number of professional construction teams and skilled workers to ensure the progress, quality, and safety of the construction. Construction projects require a large quantity of materials, including main purchased items like cement, wood, and steel, as well as bulk local materials such as sand and gravel. The materials department actively procures and supplies these, extensively investigates material sources, expands supply channels, organizes deliveries according to usage plans, ensures project requirements are met, and also works with the testing department to maintain the quality of incoming raw materials. Under the leadership of the Project Chief Engineer, in accordance with the construction regulations and systems based on the project method, combining the characteristics of the project, and in accordance with the company's construction technology management regulations, practical and feasible technical management measures are formulated. These measures are to be implemented and supervised by the Project Chief Engineer. The main contents are as follows: Gather meteorological, topographical, hydrogeological conditions to provide necessary basis for compiling special construction plans and guiding construction. Promptly organize relevant personnel to familiarize themselves with design drawings, understand design intent and related details, clarify quality requirements, and verify issues and doubts on the drawings. Actively cooperate with the owner and design department in completing design drawing briefing before construction, aiming to resolve issues on the drawings as much as possible before the project begins.

Phone Consultation