High column_SupplyPro Co., Ltd._Yichengxing Environmental Engineering Co., Ltd. of Xinjiang 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yichengxing Environmental Engineering Co., Ltd. of Xinjiang

Yichengxing Environment Engineering Co., Ltd. in Xinjiang is a professional m...

13659935695 13699387590

High column

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Xinjiang/Urumqi
有效期至:
长期有效
最后更新:
2022-06-11 17:13
Product Details

High-column advertising production, building signages, and facade illumination projects!

For the actual high-pole construction situations, equip with necessary construction machinery and equipment, skilled technical workers, and strictly adhere to the contract documents. Based on the principle of resource optimization, select and configure a complete set of professional machinery and detection instruments according to the overall construction plan and detailed construction methods for this project. Provide an adequate number of professional construction teams and skilled workers to ensure construction progress, quality, and safety.

Construction projects require a large amount of materials, including major purchased items such as cement, wood, and steel, as well as bulk local materials like sand and gravel. The materials department actively procures and supplies these, extensively investigates material sources, diversifies supply channels, organizes deliveries based on material usage plans, ensures project requirements are met, and also collaborates with the testing department to maintain quality control of incoming raw materials.

Under the leadership of the Chief Project Engineer, in accordance with the construction regulations and systems of the project method, combining the characteristics of the project, and in accordance with the company's construction technical management regulations, practical and feasible technical management measures are formulated. The Chief Project Engineer is responsible for the implementation of these measures, with the main content as follows:

Gather meteorological, topographical, hydrogeological conditions to provide necessary basis for compiling special construction plans and guiding construction. Promptly organize personnel to familiarize themselves with design drawings, understand design intentions and related details, clarify quality requirements, and verify issues and doubts on the drawings. Actively cooperate with the owner and design department to complete design drawing handover before construction, aiming to resolve issues on the drawings as much as possible before the project starts.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13659935695

Back to Top