High mast_SupplyPro Co., Ltd._Yichengxing Environmental Engineering Co., Ltd. of Xinjiang 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yichengxing Environmental Engineering Co., Ltd. of Xinjiang

Yichengxing Environment Engineering Co., Ltd. in Xinjiang is a professional m...

13659935695 13699387590

High mast

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Xinjiang/Urumqi
有效期至:
长期有效
最后更新:
2022-06-11 17:13
Product Details

High-column advertising production, building signages, and facade lighting projects!

For the actual construction of high columns, equip with the necessary machinery and equipment, skilled technical workers, and strictly adhere to the contract documents. Based on the principle of resource optimization, select and configure a complete set of professional machinery and detection instruments according to the overall construction plan and detailed construction methods for this project. Provide an adequate number of professional construction teams and skilled workers to ensure the progress, quality, and safety of the construction.

A substantial amount of materials is required for construction projects. In addition to the main purchased materials such as cement, wood, and steel, there are also bulk local materials like sand and gravel. The materials department actively procures and supplies these, extensively investigates material sources, broadens supply channels, organizes the delivery based on material usage plans, ensures the project's needs are met, and simultaneously coordinates with the testing department to maintain the quality of raw materials upon arrival.

Under the leadership of the Project Chief Engineer, in accordance with the construction regulations and systems based on the project method, combining the characteristics of the project, and in accordance with the company's construction technology management regulations, practical and feasible technical management measures are formulated. These measures are to be implemented and supervised by the Project Chief Engineer. The main content is as follows:

Gather meteorological, topographical, hydrogeological conditions to provide necessary basis for compiling special construction plans and guiding construction. Promptly organize relevant personnel to familiarize themselves with design drawings, understand design intent and related details, clarify quality requirements, and verify issues and doubts on the drawings. Actively cooperate with the owner and design department to complete pre-construction design drawing briefing, aiming to resolve issues on the drawings as much as possible before the project starts.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13659935695

Back to Top