- AllProduct Category
-
SY Oxygen Sensor
Others
Marathon Oxygen Probe
FC Oxygen Probe
Carbon King Oxygen Probe
SSI Oxygen Sensor
Joint Venture Oxygen Sensor
Epsen Oxygen Sensor
Mesa Oxygen Sensor
Hydrogen Probe


详情描述
Start the atmosphere mixers of furnace 1-4 in sequence and check for smooth operation without any abnormal sounds.
4. Initiate the main furnace heating system and heat up in segments according to the set temperature control curve.
- 400℃ stage: Insulation for 2 hours (for further removal of residual moisture and elimination of low-temperature stress).
- At 600℃ stage: Insulate for 2 hours (to promote even expansion of the furnace material).
- 800°C stage: Insulate for 2 hours (reaches working temperature, ready to establish atmosphere).
**(II) Carbon Potential Control System Operation**
1. Turn on the carbon potential control cabinet power, and set the target process carbon potential value on the control interface (e.g., 1.0%C).
2. Once the main furnace temperature stabilizes at 800°C, gradually open the pipeline valves and adjust the drip flow to the recommended process value (e.g., 100-120 drops per minute) based on the flowmeter indication.
Daily Motto: Actions speak louder than words.
















