Following the delivery of the sterilization equipment to your company, our after-sales service personnel and electrical engineers have traveled to your site to provide installation and debugging guidance, as well as on-site training for your staff. Your company should first specify the location for the fixed equipment and assign a dedicated person (referring to the equipment operators during the production process, with the number determined by your company) to assist our team in installation and debugging. During the installation process, your assigned installers learn and install simultaneously, ensuring they are fully acquainted with the basic features and working principles of the sterilization equipment by the end. This allows for a more efficient debugging and testing phase.
2、Installation Requirements:
Sterilization equipment should be placed horizontally.
The area where equipment is placed should be as spacious as possible for ease of operation and maintenance.
c. The steam pressure entering the sterilization pot must not be less than 0.5 MPa and be connected to the vicinity of the sterilization equipment.
d. The exhaust outlets of the sterilizing pot and hot water tank should be connected to the outside of the workshop.
The power supply (380V, three-phase four-wire) should be connected near the sterilization equipment.
f. Inlet and outlet pipes connected near sterilization equipment.
The compressed air interface is also connected near the sterilization equipment, ensuring a pressure of no less than 0.6 Mpa.