Installation Steps for Lightweight Partition Panels
1. Clean the structural, ground, and floor surfaces, mark off levels, and leave openings for doors and windows. 2. Begin installation from one side of the main structural surface. If there are doors and windows, start from both sides; leave the installation of partition panels in the middle, cutting as needed to fit the space. 3. For plumbing, heating, and electrical equipment, first lay out the lines, drill and bond pre-buried components or switches and sockets before installing partition panels; when horizontal line slots are required, the user should self-excavate for wiring, then fill and level with putty, and mark with a line. 4. Installation Temperature: Installation is possible above -10 degrees Celsius. 5. Panel Seam Treatment.
II. Key Points for Installing Lightweight Partition Boards
1. Inspect the partition panel's geometric dimensions to ensure compliance with standard requirements. 2. Pre-fixture the iron pieces according to the layout at the designated locations. 3. Begin installation from one side, following the layout. If there are door and window openings on the partition panel, start from the openings towards both sides. Align with the chalk line, use a prybar to gently撬动at the bottom, press the top tightly, ensure the edges are firm, and securely wedge the bottom with wood wedges, adding reinforcing elements. 4. During installation, regularly check for flatness, plumbness, and other relevant items. 5. The laying of water and electricity conduits should be synchronized with the partition panel installation. If the partition panel needs to be opened, drill holes before installation, with the opening not exceeding 80mm x 80mm; hanging pieces for water and heating cannot exceed 80 kilograms. For hanging pieces over 80 kilograms, they must be installed on the fixed pre-buried elements of the partition panel. 6. Around electrical wiring, switches, and outlets, apply filling material to smooth the surface. 7. The adhesive material must be dry before proceeding to the next stage; typically, decoration can be done 10-15 days after the normal installation date. 8. The installed partition panel surface must not have peeling, chipped corners, hollowing, or cracks. The surface should meet the intermediate plastering standard for building walls, calculated by the plane of each wall.
Section 3: Installation Requirements for Lightweight Partition Panels
1. The top and bottom of the beam are secured with U-shaped iron pieces, which are fastened to the bottom of the beam with射钉, reinforced at the top with wooden wedges, and fixed with L-shaped iron pieces.2. Hanging Design: The spacing between hanging points should not be less than 300m, and the single-point load should not exceed 80 kg. It is necessary to first open and bury components. 3. Electrical Design: Electrical wiring can be designed as concealed, utilizing wallboard holes to pass through flexible tubes; or as exposed wiring, laid on the wall with corresponding open outlets. 4. Moisture and Water-Resistant Design: The decorative design should consider moisture and water resistance. When designing attachments such as water basins, tanks, and washbasins along the wall, the wall should be coated with waterproof paint or lined with tiles and other waterproof decorative materials. 5. Wall Decoration: Decoration can be done using materials such as white paint, porcelain spray, and tile粘贴. When performing the next stage of decoration, first clean the wall of partition boards, moisten it with water, and proceed with decoration following standard construction techniques.




通过中商114认证 

