What are the requirements for school track flooring treatment?_News Center Co., Ltd._Tangshan Nuorun Environmental Protection Technology Co., Ltd.
Tangshan Nuorun Environmental Protection Technology Co., Ltd.

Epoxy floor coatings, self-leveling epoxy floors, epoxy colored sand floors, ...

Consultation Hotline
13363232954

Product Categories

Contact Information
  • Contact person:王经理
  • Telephone:13363232954
  • Mobile:13363232954

Home > News Center Co., Ltd. > What are the requirements for school track flooring treatment?
News Center Co., Ltd.
What are the requirements for school track flooring treatment?
Publish Time:2024-11-25        View Count:33        Return to List

The quality of the surface layer of school track surfaces directly affects student physical exercise and the lifespan of the track. What are the requirements for the floor treatment of school tracks? Material quality control: Use qualified materials, conduct full inspection and re-examination, store them in batches and categories, and strictly follow material usage procedures. Epoxy floor construction measurement control: Develop an accurate engineering measurement plan and establish a high-precision control micro-triangulation network for construction layout. Each three-dimensional coordinate control point is measured by a designated person, with instruments checked and calibrated at regular intervals, and with assistance from surveyors to ensure quality. Friction coefficient test control: The mixture ratio of the track surface and the determination of the friction coefficient of the completed track surface are entrusted to an institution. Operator training control: Operators participating in this project must undergo specialized technical training, and through training, they should master construction methods, operation skills, and quality standards. Coating treatment control: Clean and level the sub-base of the track as mentioned. Proportioning and measurement control: Construction personnel strictly follow the proportioning notice for material preparation, with a laboratory technician on-site to supervise and ensure timely preparation of test blocks and records. High material measurement accuracy is required, and operations must be carried out strictly in accordance with the prescribed quality formula ratios.



13363232954