CNAS Accreditation Consulting | CNAS Certification Advisory Services
CNASAcknowledged consultation process:
1.Current Status Research and Diagnosis
Ø Human resources status, organizational structure, departmental and position setup.
Ø Equipment Configuration and Management Information
Ø Usage of inspection methods
Ø SampleProduct management status
Ø Reagents, quality control materials, and calibration items usage and management
Ø Facility equipment and environmental control conditions
Ø Lab layout situation
Ø Purchasing Process, Recruitment Process, Contract Review Process, Sample Collection Process, Report Printing and Issuance Process, Security and Prevention Process for Personnel Entry and Exit to the Inspection Area
Ø Laboratory personnel collaborate with the research and provide information.
2.Management System Planning
Ø Organization Chart Design
Ø Departmental Setup, Position Setup
Ø Guidelines for the Application of the Relevant Standards
Ø Program Files to be Developed
Ø Time Schedule and Expectations
Ø Lab personnel to assist with research, senior management to collaborate on system planning. Provide necessary materials.
3.Recent work to be undertaken
Ø Consultants assign tasks for the current lab's capabilities. Lab personnel make corrections and implement the contents as stated in the research report.
4.Training Topic
Ø Internal Auditor Training Series: Standard Implementation Training
Ø Internal Auditor Training Series: Audit Key Points and Basic Audit Knowledge Training
Ø Training on Uncertainty Knowledge
Ø Application Material Filling Training
Ø Audit Preparation Training
Ø Consultancy company personnel are responsible for training. Laboratory staff arrange for training attendees, venue, printing of handouts, projector equipment, and whiteboard.
5.System Operation Guidelines
Ø Direct laboratory staff to comply with management system requirements. CNAS Requirement for operational management system.
Ø Laboratory personnel carry out system operations as guided by consultants.
6.Application Material Filling Instructions
Ø Application Form
Ø Application Attachment (e.g., Inspection System)Analysis Performance Validation Report, Detection System/Daily Quality Control MethodProposal, Laboratory Risk Assessment Report, Other Relevant Laboratory Reports: Contract Review Report for the provided inspection services.Personnel training and competency assessment reports for various positions, internal audit reports, management review reports, etc.
7.Internal Audit
Ø Planning and Leading Internal Audits
Ø Develop internal audit materials
Ø Propose corrective suggestions for non-conformities identified by the internal auditor.
Ø Laboratory Quality Manager and Internal Auditor collaborate in the implementation
8.Management Review
Ø Planning and Implementation Guidance for Management Reviews
Ø Guidelines for Input Material Preparation
Ø Prepare Management Review Report and related materials
Ø Laboratory managers and department heads collaborate in the implementation.
9.Document Review and On-Site Audit Rectification Guidance
Ø Please provide the Chinese content that needs to be translated into American English.CNASReview and guidance on editorial comments and on-site audit corrective actions
Ø Consultants and lab staff collaborateAvailable
