Basalt grating - Premium material selection, quality guaranteed_SupplyPro Co., Ltd._Taian Jiuzhou Geotechnical Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Taian Jiuzhou Geotechnical Materials Co., Ltd.

Manufactures glass fiber geogrids, unidirectional plastic geogrids, bidirecti...

13370612522
13370618566
 

Product Categories

Contact Information
  • Contact person:张霞
  • Telephone:13370618566
  • Mobile:13370612522
  • Address:Shandong Province, Taian City, Taishan District, North of Nilihe River East, Tai New Road North
Home > SupplyPro Co., Ltd. > Basalt grating - Premium material selection, quality guaranteed
Basalt grating - Premium material selection, quality guaranteed
品牌: Jiuzhou
Measurement Unit: square meters
Product Unit Price: $0.00
Minimum Order Quantity: 1. Please provide the Chinese content to be translated.
单价: 电议
最小起订Quantity: 1 square meters
供货总Quantity: 999999 square meters
有效期至: 长期有效
最后更新: 2024-04-22 17:21
 
详细Info

Product Features

    The products feature high strength, low elongation, high resistance to high temperatures, high modulus, light weight, good toughness, corrosion resistance, and long service life, and can be widely used in the repair of old cement roads and airport runways.

Dams, riverbanks, slope protection, road and bridge pavement reinforcement, etc., provide pavement reinforcement and reinforcement to prevent rutting fatigue cracks, thermal expansion and contraction cracks, and reflective cracks underneath.

Disperses pavement bearing stress, extends pavement lifespan, high tensile strength with low elongation, no long-term creep, excellent physical and chemical stability, good thermal stability, fatigue crack resistance, high-temperature resistance

Rut resistance, low-temperature crack resistance, delayed reduction of reflective cracks.

Product Application

    1. Old asphalt concrete pavement, reinforced asphalt surface treatment, disease prevention and control.

    2. Reconstructing concrete road surfaces with composite pavements to suppress reflective cracks caused by plate shrinkage and other factors.

    3. Road widening project, prevents cracks caused by the combination of old and new sections and uneven settlement.

    4. Reinforced treatment of soft soil foundation, conducive to the dewatering and consolidation of soft soil, effectively controls settlement, ensures uniform stress distribution, and enhances the overall strength of the subgrade.

    5. Newly constructed road semi-rigid subgrade may develop shrinkage cracks; reinforced enhancement is used to prevent the reflection of base cracks causing pavement cracks.





询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

13370612522