Basalt Grating - Factory Supply - Sufficient Stock_SupplyPro Co., Ltd._Taian Jiuzhou Geotechnical Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Taian Jiuzhou Geotechnical Materials Co., Ltd.

Manufactures glass fiber geogrids, unidirectional plastic geogrids, bidirecti...

13370612522
13370618566
 

Product Categories

Contact Information
  • Contact person:张霞
  • Telephone:13370618566
  • Mobile:13370612522
  • Address:Shandong Province, Taian City, Taishan District, North of Nilihe River East, Tai New Road North
Home > SupplyPro Co., Ltd. > Basalt Grating - Factory Supply - Sufficient Stock
Basalt Grating - Factory Supply - Sufficient Stock
品牌: Jiuzhou
Measurement Unit: square meters
Product Unit Price: $0.00
Minimum Order Quantity: 1. Please provide the Chinese content to be translated.
单价: 电议
最小起订Quantity: 1 square meters
供货总Quantity: 999999 square meters
有效期至: 长期有效
最后更新: 2024-04-22 17:22
 
详细Info

Product Features

    Products feature high strength, low elongation, high-temperature resistance, high modulus, light weight, excellent toughness, corrosion resistance, and long lifespan, and are widely applicable for the maintenance of old cement road surfaces and airport runways.

Dike, riverbank, slope protection, and road bridge pavement enhancement projects. We offer pavement reinforcement and strengthening to prevent rutting fatigue cracks, thermal expansion and contraction cracks, and reflective cracks below.

disperses pavement bearing stress, extends pavement service life, high tensile strength with low elongation, no long-term creep, good physical and chemical stability, good thermal stability, resistance to fatigue cracking, and high temperature resistance

Ruts, resistance to low-temperature shrinkage cracking, and delay reduction of reflective cracking.

Product Application

    1. Old asphalt concrete pavement, reinforced asphalt surface treatment, disease prevention and control.

    2. Reconstruct concrete road surfaces into composite surfaces to suppress reflective cracks caused by plate shrinkage.

    3. Road expansion project, prevention and control of cracks caused by the junction of old and new sections and uneven settlement.

    4. Reinforced treatment of soft soil foundation, conducive to the dewatering and consolidation of soft soil, effectively inhibits settlement, ensures even stress distribution, and enhances the overall strength of the subgrade.

    5. Newly constructed road subgrade with semi-rigid pavement generates shrinkage cracks; reinforced reinforcement prevents the reflection of base cracks causing pavement cracks.






询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

13370612522