Introduction to the Installation Method of Organic Fire Retardant Mortar_News Center Co., Ltd._Langfang Shugui Chemical Industry Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Langfang Shugui Chemical Industry Co., Ltd.

Fire-resistant material production and sales, firestop material production an...

15632650999
 

News Category
  • No Category
Home > News Center Co., Ltd. > Introduction to the Installation Method of Organic Fire Retardant Mortar
News Center Co., Ltd.
Introduction to the Installation Method of Organic Fire Retardant Mortar
Publish Time:2022-09-07        View Count:50         Return to List

1. Installation and Measurement

Measure and calculate the size and dimensions of cable well holes, floor thickness, and the position and dimensions of the cable within the well. During installation, thoroughly review all hole sizes and the surrounding conditions of the holes, and keep detailed records.

2. Construction Process:

(1) Construction Process:

Clean up the grassroots—Lay out—Drill holes—Cut fireproof boards—Sand down the edges of fireproof boards—Attach fireproof boards—Apply organic fireproof mortar—Check and add fireproof mortar—Clean the fireproof boards

(2) Key Operational Points:

Streamline the Foundation: Includes sweeping, removing construction debris, and loose concrete sections

Pattern: The length of the fire-resistant panel and base layer overlap should be ≥5cm. Based on this size and the fire-resistant panel dimensions, draw lines to determine the bolt hole positions, ensuring bolt center spacing is ≤15cm. Use flexible organic sealant, evenly distributing on both sides. Ensure that bolts are fixed at each corner and properly marked.

Punching: Use an impact drill with a diameter of 6-8mm to drill holes along the line and install bolts.

Cutting Fire Retardant Boards: Use sheet material cutting tools to cut fire retardant boards to the on-site dimensions and initially install them to ensure they meet installation requirements. File Down Fire Retardant Board Edges: Use a file to dull the zinc-plated edges of the cut fire retardant board to prevent damage to cables.

Fire-retardant Panel: Secure the fire-retardant panels to the substructure with bolts as required, ensuring that the galvanized steel plate's galvanized side faces outward during installation. First, stack fire-retardant packages around the cable well, then seal the gaps between and around the cables with fireproof mortar, paying attention to the neatness, compactness, and airtightness of the stack. Ensure that the fire-retardant packages around the cables are filled tightly and compacted.

Apply Non-Curing Fireproof Mortar: Apply non-curing fireproof mortar around the fireproof surface and at joints, ensuring even and smooth application.