Before installing the glass fiber reinforced plastic desulfurization tower pipeline, it's crucial to ensure that the surrounding checks are completed to avoid any impact on future use and unnecessary troubles. So, what checks need to be done before installing the glass fiber reinforced plastic desulfurization tower pipeline? Today, I'll address this question for you.
Before installation, all connecting materials, including the glass steel desulfurization tower's glass steel pipes and other accessories, must be inspected. Installation can only commence once the materials are confirmed to meet design specifications and are of high quality. The surface of the glass steel pipes must be smooth and flat; delamination is strictly prohibited. Variations in color depth due to the removal of wax from the glass fabric, as well as bubbles and wrinkles, are permissible.
2. The installation of glass fiber desulfurization towers requires ensuring the safety and proper operation of underground pipelines. When it comes to issues of span within the underground pipelines, span calculations are necessary. Underground pipelines are supported by pipe racks, hangers, and supports, and the distance between the two support points is what is referred to as the pipeline span.
3. Many glass-fiber reinforced sulfur removal tower pipes are now primarily used in underground pipelines. Of course, the span cannot be too large, as this will directly affect the normal operation of the pipes. If the span is too small, it will make the pipeline layout too dense, thereby increasing the investment costs. With the increased use of glass-fiber reinforced sulfur removal tower pipes, to ensure the sufficient safety and normal operation of the pipes, it is essential to maximize the span as much as possible. Under the action of external loads, the stress generated at the pipeline interface must not exceed the allowable stress range of the glass-fiber reinforced pipes.
News Center Co., Ltd.