With the continuous improvement of people's living standards, the application regulations for sports facilities have become increasingly stringent. The previous concrete court surfaces are no longer sufficient to meet the requirements of the sports experience. As a result, artificial turf basketball courts have gradually become the preference of sports enthusiasts. Everyone wants to know how they are made. So, let's discuss the specific steps for constructing artificial turf basketball courts.
The specifications for a plastic basketball court must be based on the materials and the area it occupies. For instance, a 500-square-meter basketball court would require us to prepare the corresponding materials for construction, followed by the creation of a design plan for the 500-square-meter basketball court.
To construct a plastic basketball court, the first step is to select a suitable location, ideally an open area. The subsequent process involves preparing the base, which includes grinding, smoothing, and cleaning it. Then, a waterproof primer is applied and allowed to dry. Beforehand, the amount of materials needed, such as polyurethane adhesive and EPDM granules, is estimated based on the area specifications of the site. These materials are prepared and kept on-site. The site is marked according to the design and divided into sections or colored areas to enhance the adhesion between the base and the surface layer. Therefore, a bonding layer must be applied first.