Shijiazhuang Epoxy Floor Paint Manufacturer Shares: Steps and Precautions in the Construction Process_News Center Co., Ltd._Hebei Shangdi Coating Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Hebei Shangdi Coating Technology Co., Ltd.

Epoxy Floor Paint, Polyurethane Floor Paint, Water-Based Epoxy Penetrating Pr...

Consultation Phone:

17798068168

  
News Category
  • No Category

Contact Information
  • 联系人:高女士
  • 电话:17798068168
  • 手机:17798068168


Company Information

Location:Hebei/Shijiazhuang

Shop Level: VIP

Business Model:

地址:No. 44, North Jianshe Street, Chang'an District, Shijiazhuang City, Hebei Province, Room 1701, Hanke Building

Business Card

Hebei Shangdi Coating Technology Co., Ltd.

  • 联系人:高女士 (女士) 
  • 电话:17798068168
  • 手机:17798068168
  • 地址:No. 44, North Jianshe Street, Chang'an District, Shijiazhuang City, Hebei Province, Room 1701, Hanke Building
home > News Center Co., Ltd. > Shijiazhuang Epoxy Floor Paint Manufacturer Shares: Steps and Precautions in the Construction Process
News Center Co., Ltd.
Shijiazhuang Epoxy Floor Paint Manufacturer Shares: Steps and Precautions in the Construction Process
Publish Time:2024-12-13        View Count:41         Return to List

Epoxy Floor PaintThe following are the steps and precautions during the construction process:

 

Construction steps are as follows:

Construction Preparation

Clean the construction area to ensure a dust-free, oil-stain-free, old paint-free, and debris-free surface.

Inspect and grind uneven areas to enhance the adhesion of the epoxy floor paint.

To repair ground cracks and potholes, fill with epoxy mortar or specialized repair materials to ensure a smooth and dense surface.

2. Bottom Coat Application

Mix the epoxy resin and hardener uniformly according to the recommended ratio.

By applying the primer evenly to the ground using roller, scraper, or brush methods, ensure the primer is fully wetted into the concrete and penetrates the inner layers to enhance the bonding between the floor paint and the base, as well as to seal the pores of the base.

3. Middle Coat Application

The intermediate coating is typically made of a mixture of epoxy resin and quartz sand, used to enhance the thickness and wear resistance of the flooring.

After the undercoat dries, apply the intermediate coating material evenly to the ground to form a layer of a certain thickness.

After the intermediate coating cures, it is then sanded to remove surface particles and irregularities, providing a smooth base for the topcoat application.

4. Coating Application

The face coating is the outer layer of the epoxy flooring paint system, featuring wear resistance and decorative effects.

The translation is incomplete. Please provide the complete Chinese content for translation into American English.Epoxy TopcoatMix the binder and hardener uniformly in proportion.

Apply the primer evenly to the floor using a roller or brush. Additional coats may be required to achieve the desired effect, as needed.

5. Maintenance

Upon completion of the construction, the ground surface requires proper maintenance. Initially, avoid heavy loads crushing and sharp objects scratching.

During maintenance, control the entry and exit of personnel and vehicles to prevent damage to the newly constructed floor.

Typically, the flooring requires at least 7 days of maintenance after completion to prevent moisture or solution penetration.

 

Please note the following:

Construction Environment

Construction environments should be kept dry and dust-free, avoiding work under conditions of high humidity (such as relative humidity greater than 80%) or low temperatures (such as below 5℃).

Job Site* Maintain ventilation to ensure proper circulation of paint.

2. Material Ratio

Mix materials strictly according to the proportions specified in the product manual for epoxy floor paint to ensure the construction effect.

3. Coating Thickness

Appropriate coating thickness offers enhanced protective effects. Both excessive and insufficient thicknesses are detrimental to the performance of the floor paint.

4. Security Protection

Workers should wear appropriate protective gear, such as masks, gloves, and goggles, to prevent skin irritation from paint and inhalation of harmful gases.

5. Construction Timeline

Epoxy floor paint has a limited shelf life after mixing (e.g., 30 minutes at 25℃), so it should be used immediately after mixing to prevent waste.

6. Construction Records

Contractors should maintain accurate records of the construction location, time, temperature, relative humidity, flooring surface treatment, materials, etc., for future reference.

7. Post-construction cleanup

After painting, equipment and tools should be cleaned immediately to prevent difficulty in removal once the paint has cured.

Floor Protection

During the flooring maintenance period and in subsequent use, avoid using objects with sharp edges, such as metal parts, to collide with the ground to prevent damage to the flooring coating.

 

In summary, the application process of epoxy floor paint must strictly adhere to the construction steps and precautions to ensure the quality and longevity of the flooring.


b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
17798068168

Back to Top