Proper Procedures for Installing Pre-Drilled Small Guides_News Center Co., Ltd._Shandong Zhishuo Metal Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Zhishuo Metal Products Co., Ltd.

Grouting Tube, Steel Flower Pipe, Grouting Steel Flower Pipe, Tube Shield, St...

Consultation Hotline
13129537109  15263500636

Product Categories
Home > News Center Co., Ltd. > Proper Procedures for Installing Pre-Drilled Small Guides
News Center Co., Ltd.
Proper Procedures for Installing Pre-Drilled Small Guides
Publish Time:2022-04-18        View Count:45        Return to List

Advanced small conduit must be handled with care during safe operation; it is crucial that everyone takes note of the related precautions. Zhengzhou Grouting Machine Manufacturer provides a detailed introduction to the various safety operation precautions for grouting machines, hoping it will be helpful to all.

Establish comprehensive responsibility systems for various positions and strictly enforce on-site handover procedures.

Drilling machine grouting pumps and high-pressure pipelines must undergo trial operation to confirm the mechanical performance of various valves and pipelines, and ensure that the pressure gauge is in good working order before construction is permitted.

Before each grouting, carefully check the sensitivity of the safety valve and pressure gauge, and adjust them to the specified grouting pressure position.

When installing high-pressure piping and pump head components, all threaded connections must be tightened securely to ensure proper sealing.

5. During the grouting process, it is strictly prohibited for on-site personnel to remain near the grouting holes to prevent the bursting of the sealing gel check valves and potential injury.

6. No unauthorized shutdown of water or electricity is allowed during grouting. Necessary shutdowns must be notified in advance, and water and electricity may only be shut off after grouting is completed and flushed.

During the grouting construction, a dedicated mechanical and electrical maintenance technician must be present to promptly handle any mechanical or electrical failures.

Employees at the grouting site must wear safety helmets, protective goggles, masks, and gloves, etc., safety equipment, before they can carry out grouting operations.

The operation steps for the advanced small conduit are actually not well-known to most users, as it is primarily handled by professionals in various industrial fields. Therefore, when those of us who don't frequently use the advanced small conduit attempt to operate it, it can be quite challenging. By explaining several safety operation precautions related to the advanced small conduit, we aim to prevent any adverse incidents during its use.


 Click submit means you agree to《Service terms》《Privacy policy》

15263500636