Reinforcement construction_Engineering Case Studies Co., Ltd._Henan 3D Construction Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Henan 3D Construction Technology Co., Ltd.

Focused on building tilt correction and ground settlement...

Consultation Hotline
13213158282

Home > Engineering Case Studies Co., Ltd. > Reinforcement construction
Reinforcement construction
品牌: 3D Architecture
Brand: 3D Architectural Design
Engineering: Lifting and alignment correction
Professionalism: High
单价: 100.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 999 square meters
有效期至: 长期有效
最后更新: 2022-10-29 15:20
 
详细Info

The Anyang plant area of a major state-owned enterprise in China features a single-story portal frame structure with continuous spans. The foundation is of the independent type, with some foundations resting on backfilled soil from an original 25-meter deep trench. Due to the foundation's sinking, the surface of the overhead traveling beams became uneven, rendering them unusable. Field monitoring revealed further settlement of up to 125mm, necessitating lifting and alignment correction.


Design drawings incorporate anchor bolt static pressure pile construction. Steel pipe specifications are 159*6mm, with pile length of 12m as per geological survey report, extending 500mm into the fifth soil layer. The pile is grouted with C35 fine aggregate micro-expansion concrete, followed by lifting with a lifting device.


The H-shaped steel column under the beam structure is 9.0 meters tall. The greater challenge encountered during the lifting process was the column's stability. The project team conducted in-depth research and scientific guidance, ensuring principles of economy, simplicity, and speed. They added lateral supports between the columns and inclined tie rods in the vertical direction. The columns were lifted in sync with the walls, and their stability was well-maintained throughout the lifting process.


After the tireless efforts of four technicians and thirty skilled一线 workers, the task was completed successfully within the scheduled timeframe, restoring the use of the vehicle and maximizing the recovery of the customer's losses.