Lifting and alignment correction_Engineering Case Studies Co., Ltd._Henan 3D Construction Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Henan 3D Construction Technology Co., Ltd.

Focused on building tilt correction and ground settlement...

Consultation Hotline
13213158282

Home > Engineering Case Studies Co., Ltd. > Lifting and alignment correction
Lifting and alignment correction
品牌: 3D Architectural Models
Brand: 3D Architecture
Material: Reinforced concrete
Project timeline: As per contract requirements
单价: 100.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 999 square meters
有效期至: 长期有效
最后更新: 2022-10-29 15:20
 
详细Info

East District Tunnel Corridor Correction Foundation Reinforcement Project, located on the North龙湖 Financial Island in Zhengzhou City. Due to the heavy rain on July 20, the soil of the tunnel foundation was eroded and lost, resulting in uneven settlement of some parts of the tunnel, severely affecting normal use. Reinforcement treatment was conducted on the damaged sections and the tunnel was lifted and corrected.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13213158282