What are the precautions to take during the reinforcement design and construction in Henan? How much do you know about this? Today, the editor from Henan Sanwei Building Technology Co., Ltd. introduces this issue to you, hoping it can be helpful.
1. Concrete surface treatment for reinforced construction components
1) Remove any degraded concrete, such as spalling, loosening, honeycombing, and corrosion, from the surface of the reinforced components, exposing the concrete structural layer.
2) Reinforced components are ground smooth to remove surface slurry, oil, and other impurities, until the new concrete surface is fully exposed. The corner粘贴 areas should be beveled and ground into a rounded arc shape, with the radius not less than 20mm. The surface should then be restored smooth using repair materials.
3) Cracks should be sealed or filled in accordance with the specifications.
4) After surface polishing, thoroughly clean the dust from the surface using a powerful blower or vacuum cleaner, and keep it dry.

2. Prepare and apply the base resin
1) Bottom resin should be mixed according to the process specifications provided by the product manufacturing factory.
2) Apply the base resin evenly on the concrete surface using a roller brush. It is advisable to proceed with the next step of construction as soon as the base resin surface feels dry to the touch.
3. Leveling Treatment for Adhesive Surfaces
1) The leveling material should be mixed according to the process specifications provided by the product manufacturing factory.
2) To repair concrete surfaces, use acetone to wipe away surface dust. For concave areas, use patching glue to level them; for sections with gaps or corners, apply a smooth curved surface.
3) The corner should be repaired with leveling material to form a smooth circular arc, with a radius not less than 20mm.
4) Use a scraper with a blade width of ≥100mm to fill and repair the dents, ensuring the leveling is smooth with no visible scraper or scraper marks as observed by the naked eye.
5) It is recommended to proceed with the next stage of construction as soon as the leveling material is dry to the touch.