Gold Sand Abrasion-Resistant Flooring Engineering Requirements for Concrete Construction_News Center Co., Ltd._Lingshou County Qianxin Mineral Products Processing Factory 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Lingshou County Qianxin Mineral Products Process

Our main products include: colored sand, tourmaline, mica, vermiculite, quart...

13131179120
 

News Category
  • No Category

Contact Information
  • Contact person:刘永明
  • Telephone:13131179120
  • Mobile:13131179120
  • Address:Hebei Province, Shijiazhuang City, Lingxiang County, Dongzhuang Village, Nanyan River Town
Home > News Center Co., Ltd. > Gold Sand Abrasion-Resistant Flooring Engineering Requirements for Concrete Construction
News Center Co., Ltd.
Gold Sand Abrasion-Resistant Flooring Engineering Requirements for Concrete Construction
Publish Time:2023-11-20        View Count:105         Return to List

One, requirements for concrete:
  1Must achieve C25 or above (at least C)20 and above).
2. Water-Cement RatioNot exceeding 0.4.
The slump of the concrete mixed on-site should not exceed 5cm, and the slump of the concrete pumped should not exceed 12cm.
4. For the concrete flooring with secondary casting, the surface layer thickness should not be less than 5cm。
5. To achieve betterEffect, recommend for concreteZhong-Canada Reinforcement Mesh (Reinforcement diameter should be ≥)φ16)。
Note: Precautions for Concrete Pouring
  1Pouring must be carried out sequentially in separate storage areas.Prevent uneven concrete curing.
2. To ensure the concreteThe soil has sufficient fluidity and setting retardancy, allowing for the appropriate addition of setting retardant admixture.
3. Recommend a one-time castingAs per design elevation, if not fitted with waterproofing.Films, water must be sprinkled onto them.The foundation is in a moist condition.
4. Ensure concrete is thoroughly compacted, particularly in the corners and edges.
5. As the surfaceNo Chinese content provided. Please provide the text to be translated.No content provided.
6. Initial WorkKeep as flat as possible for easy surface completion.Achieved a height difference of less than 3mm/2M.

 Click submit means you agree to《Service terms》《Privacy policy》

13131179120