Stainless Steel YX75-230-690 Floor Deck Manufacturer_News Center Co., Ltd._Wuxi Puleshi Steel Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Wuxi Puleshi Steel Co., Ltd.

Manufacturing, processing, and selling of open and closed deck plates, colore...

Consultation Hotline
13671961013

News Category
  • No Category

Contact Information
  • Contact person:萧天
  • Telephone:13671961013
Home > News Center Co., Ltd. > Stainless Steel YX75-230-690 Floor Deck Manufacturer
News Center Co., Ltd.
Stainless Steel YX75-230-690 Floor Deck Manufacturer
Publish Time:2023-07-12        View Count:105        Return to List

不锈钢YX75-230-690楼承板生产厂家

 


Stainless SteelYX75-230-690 Floor Deck Manufacturer, Pulei Steel Industry, offers 24/7 accurate consulting services. We specialize in the production of reinforced steel truss floor decks, closed floor decks, various corrugated steel plates, high-frequency welded H-beams, and accessories like cylindrical headed nails. As a professional supplier of steel structure cladding, we are not limited to steel structure cladding but also enjoy widespread acclaim in the corrugated plate industry. Our core products include closed floor decks, corrugated steel plates, and full or damaged corrugated steel plates. How to choose based on the plate characteristics? Regardless of the type of floor deck, higher utilization results in lower costs, with utilization rate being equal to effective width divided by raw material feed width. Our steel structure products, such as aluminum alloy roof panels and reinforced steel truss floor decks, are guaranteed to be installed with edge placement and fixed to surrounding safety ropes. Note that the cutting length of floor decks is 4.97~8.97m, with secondary beam spacing at 3m. When installing floor decks, pay attention to the column grid spacing, which is generally 5~9.0m×8~15m, and welding is performed using penetration spot welding connections.

 

Due to the fact that steel truss floor decks are made by welding steel and galvanized plates, if the welding equipment is of poor quality, the welding quality will be compromised, which may result in..."Soldering failure is a fatal issue, with a high probability of occurrence if it covers a large area. The reinforced steel truss floor slab directly supports steel or concrete beams, serving as both the tensile reinforcement for the concrete floor and as the formwork for construction scaffolding. This saves time in setting up scaffolding and formwork. The reinforced steel truss floor slab achieves steel cutting, positioning, and sizing at the factory, resulting in minimal waste and environmental benefits. On-site, only the transverse reinforcement and connecting bars need to be arranged for the floor slab, reducing the steel binding work by 60 to 70%, thereby improving overall construction speed. The floor slab's weight is entirely supported by the steel, eliminating tensile stress within the concrete. During use, the tensile stress in the negative bending and positive bending zones is significantly reduced, narrowing crack widths. The presence of galvanized steel avoids exposed cracks beneath the floor slab, improving its performance and durability. After using the reinforced steel truss floor slab, the floor can be designed as a two-way slab as needed.

 

We consistently meticulously understand our clients' needs, including the requirements for reinforcement bars, stirrups, and ties. These connections should be securely bound with the reinforcement trusses. Timely binding of distributed reinforcement bars is essential to prevent lateral instability of the truss. During formwork installation, straightening lines should be used for alignment, and after appropriate adjustments, spot-weld the reinforcement bars to the tie bolts. We sub-contract the sizes of the floor slabs and provide the perfect packaging to ensure the integrity and ease of use during transportation and storage. Choosing Polys is choosing promptness, reliability, and peace of mind. We produce and process closed-web floor slabs, corrugated steel sheets, galvanized purlins, aluminum-magnesium-manganese panels, and Polys boasts a diverse and extensive customer base. Through long-term collaboration with numerous clients, Polys genuinely understands their requirements and meticulously addresses each one. The overlapping length of the vertical reinforcement at the formwork end on the steel beam (referring to the distance between the top flange edge of the steel beam and the end vertical support reinforcement) should be≥5d (where d is the diameter of the reinforcing steel at the bottom), and not less than 50mm.

 

The process of welding the secondary beams was disrupted. The control of the material cutting length was3-6m lengths can avoid issues with lifting between secondary beams during vertical transportation. Soft lifting slings should be used when lifting deck plates. Check for any tearing or cutting on the soft slings during each lift. Prevent overhanging when placing deck plates on steel beams. Operators should wear safety belts and ensure the deck plates are secured to the surrounding safety lines while laying materials. The cutting length of the deck plates is 4.97-8.97m, with secondary beam spacing at 3m. When installing deck plates, pay attention to the spacing of the steel column grid, generally 5-9.0m x 8-15m. Welding should use full-penetration spot welding, and a test weld with edge materials should be prepared before welding, adjusting the welding current. Since there are no horizontal formwork and vertical supports at the bottom of the deck plates, concrete pouring should not be too concentrated, and a flat vibrator should be used to evenly distribute and vibrate the material. Reinforced truss deck plates are a type of unsupported corrugated composite deck plate. The reinforced trusses are prefabricated in the back-end processing plant. On-site construction requires first placing the truss deck plates in the correct position, welding the reinforcing steel, then welding the anchor bolts, and finally placing the reinforced truss for binding before pouring concrete. muddy721

 

Easy assembly. Replaces traditional templates, improving their shortcomings, serving as part of the structural strength, reducing material costs, and facilitating reinforcement, wiring, and piping construction. Product type:YXYXYX76-313.3-940YXYXYXYXYXYXYXYX, etc. The reinforced truss floor deck is an improvement on the profiled floor deck. The reinforced truss is pre-fabricated at the back-end processing facility, with customizable lengths. It employs metal welding, silanization, pure manganese phosphatization, water washing and drying, galvanization, and other rust prevention techniques, with a rust-proof film for sealing. On-site construction requires first positioning the truss floor deck correctly, welding the reinforcement, followed by welding the rivets, and finally placing the on-site reinforcement for binding. After customer inspection, concrete pouring takes place. Other equipment includes small welding machines, air plasma arc cutting machines, sheet metal shears, etc. The main trades are welders, reinforcement workers, and sheet metal workers. The use of these advantages and disadvantages achieves mechanized production, ensuring even spacing of reinforcement and consistent thickness of the concrete protective layer, thereby improving the construction quality of the floor. Prefabricated reinforced truss floor decks significantly reduce on-site reinforcement binding work.

 

Multiple landmark skyscraper配套设施 experience, numerous public buildings, industrial factory matching, etc., Zhonggou New Materials has nearlyWith 20 years of accumulated service strength and 13 years of professional expertise in the field, we have participated in creating numerous high-quality projects, including both regional and national ones, and many award-winning projects. Recently, Zhonggou New Material has been honored with the National Gold Award for Steel Structure Projects certificate, issued by the China Building Metal Structure Association. This recognition further confirms our professional capabilities in contract performance, quality control, production capacity, and lean service, as well as our commitment to delivering quality products, services, and timelines with a spirit of unity and win-win cooperation. (Zhonggou Steel Deck wins the title of National Award-Winning Project Supplier) The Central Building (formerly the headquarters of the Southeast International Shipping Center) is a landmark building and a city complex, covering an area of 104,700 square meters and valued at approximately 5.5 billion yuan. The project has simultaneously passed the green building demonstration project and construction engineering technology demonstration project evaluations by the Ministry of Housing and Urban-Rural Development, winning the 12th China Steel Structure Gold Award (2015-2016).

 

The panel is level at the bottom and the webs are flush after construction.3-5mm gaps, if no ceiling is installed, the ceiling can be painted directly to form a企口型ceiling (similar to aluminum ceiling tiles), or it can be coated with putty and then painted with water-based paint to create a flat ceiling. Pay attention to the width of the ends to prevent tipping and potential falls. Construction is prohibited when the wind speed reaches 6m/s. Unfastened steel sheets should be re-tied; otherwise, they may be blown away by strong winds. It's convenient and also aesthetically pleasing upon completion. This article introduces the advantages of closed ceiling deck and what it is. Do not cut the steel truss. The steel truss is parallel to the end of the steel beam. Next, let's delve into the specifications of this ceiling deck! There should be no tilting to prevent injury from falling. The steel sheets should be stacked across multiple steel beams, with a single span placed between two beams, spaced at 300mm. The steel truss is perpendicular to the end of the steel beam, and the vertical reinforcement at the end of the sheet should overlap the steel beam by ≥5d, and not less than 50mm, ensuring the galvanized base can overlap the steel beam. The overlap on the steel beam should be at least 30mm, and the galvanized steel plate should be spot-welded along the length with a gap of 300mm. The steel truss is perpendicular to the end of the steel beam.

 