Liaoning Aluminum Channel Installation Solution_News Center Co., Ltd._Fushun Shunqu Pengsheng Metal Products Factory 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Fushun Shunqu Pengsheng Metal Products Factory

Specialty manufacturer of aluminum single panels, aluminu...

Consultation Hotline
13840328000   15242491777

News Category
  • No Category

Contact Information
  • Contact person:郭美玲
  • Telephone:13840328000
Home > News Center Co., Ltd. > Liaoning Aluminum Channel Installation Solution
News Center Co., Ltd.
Liaoning Aluminum Channel Installation Solution
Publish Time:2023-12-22        View Count:28        Return to List

Today, we're sharing some valuable knowledge on the installation process for Liaoning aluminum profiles.

1. Aluminum trim corners installed at the same level, Liaoning Aluminum Treadplate

2. The hangers and light steel studs were properly suspended with suitable spacing; the spacing of the hangers was less than or equal to 1.2 meters, and the spacing of the light steel studs was 1.2 meters.

3. Secure the hangers pre-installed on the triangular steel along with the triangular and light steel studs in a vertical direction, spaced according to the panel spacing, and then adjust horizontally. Liaoning Aluminum Channel

4. Press the two parallel sides of the square panel into the groove of the triangular channel, first align the corners of the two ends in the longitudinal direction, then pull a straight line and gradually fasten the panels in rows. After completing each row, adjust once to ensure the panel surface is flat and the seams are perpendicular. Liaoning aluminum square channel.

5. Wear gloves when nailing down the boards. If any stains are left on the surface, clean them with clean water. Do not peel off the protective film during installation.

Alright, that's all the introduction from the editor. Welcome to call and inquire about Liaoning Aluminum Channel!


 Click submit means you agree to《Service terms》《Privacy policy》

13840328000