Detailed procedures for the startup of second-hand shell and tube condenser units_News Center Co., Ltd._Liangshan Tengyun Chemical Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Liangshan Tengyun Chemical Equipment Co., Ltd.

Used Centrifuges, Used Dryers, Used Condensers, Used Evap...

13645479666
 

News Category
  • No Category

Contact Information
  • Contact person:张福运
  • Telephone:13645479666
  • Mobile:13645479666
  • Address:Shandong Province, Jining City, Liupu Town, Luli Jing Village, Liangshan County
Home > News Center Co., Ltd. > Detailed procedures for the startup of second-hand shell and tube condenser units
News Center Co., Ltd.
Detailed procedures for the startup of second-hand shell and tube condenser units
Publish Time:2023-08-02        View Count:33         Return to List

1. The domestic water system: Turn on the domestic water circulation pump for the tube bundle condenser, then add the pipeline to the heat exchanger, and control the pipeline supply valves to adjust the temperature of the domestic water.

2. Softening Water System: Upon activation, the water tank outlet valve is not directly used. After the softening water system is filled with water, begin preparing the softened water and start the make-up pump for replenishing the pipeline.

3. Steam-Water Heat Exchange System: Before the tube bundle condenser is activated, the管网 water system must first be filled with water. After the circulating pump is turned on, then the steam valve can be opened to initiate the steam-water exchange.

4. Operate according to the different equipment's usage standards, strictly follow the instructions manual to avoid damage due to unidirectional pressure or excessive pressure differences.

5. Water, Water Exchange System: After the tube bundle condenser is flushed, adjust the pressure data, activate the heat exchange equipment, and start the pump.

 Click submit means you agree to《Service terms》《Privacy policy》

13645479666