Modified Asphalt Bridge Deck Waterproofing Coating, Coating for Bridge Construction_SupplyPro Co., Ltd._Guangdong Zhenjian New Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangdong Zhenjian New Materials Co., Ltd.

Bridge Waterproofing Materials, Shot Blasting Projects, Waterproofing and Lea...

Consultation Hotline
17666668815

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Modified Asphalt Bridge Deck Waterproofing Coating, Coating for Bridge Construction
Modified Asphalt Bridge Deck Waterproofing Coating, Coating for Bridge Construction
品牌: Yi Bai Tu
Type: High-performance Waterproof Coating
Construction Method: Spray
Properties of the film-forming material: Organic
单价: 100.00/Drum
最小起订Quantity: 1 Drum
供货总Quantity: 9999 Drum
有效期至: 长期有效
最后更新: 2023-04-12 09:54
 
详细Info

Product Advantages

1. Eco-friendly products with excellent waterproofing performance; after coating, they solidify to form a seamless, complete elastic waterproof layer.

2. Excellent elongation, aging resistance, strong adaptability to substrates cracking, excellent frost resistance, and low-temperature flexibility.

3. Strong bonding, excellent construction performance, suitable for application on damp substrates without bubbling, good film formation, rapid curing, and short construction cycle.

4. It can also be reinforced with non-woven fabric or glass fiber when in use.

Application Range

Products are used for road and bridge waterproofing projects, and are also suitable for waterproofing of building roofs, terraces, underground, and tunnel engineering.


Construction technique

1. Surface Preparation

(1) The base material must be sturdy, flat, and clean, free of dust, grease, wax, release agents, and other debris.

(2) All small pores and sand holes can be sealed by mixing a small amount of water with Leak King to form a damp paste, then smoothing it out.

Prior to applying the paint material, the substrate can be pre-wetted but should not have any standing water.

2. Surface preparation and cleaning → Application of detailed waterproofing layer → Large-area film-forming waterproofing layer (thin coating applied multiple times) → Sealing of ends and edges → Quality inspection and acceptance → Protection and isolation layer application

(1) Subgrade Treatment: Clear the soil, stones, and debris from the bridge deck. The subgrade surface must be free of dust, dirt, and any accumulation of water, ensuring it is clean and dry.

(2) Construction must be equipped with complete tools, and the surface must be sprayed three times using a high-performance spray gun.

(3) Apply the polymer-modified asphalt waterproofing paint, then allow it to dry before applying the second and third coats of waterproofing paint, continuing until the desired thickness is achieved.

Section 6: Precautions

1. This product is suitable for use in temperatures ranging from 5°C to 35°C. It must be protected from rain, intense sunlight exposure, and frost during the construction process.

2. If there is any sediment, it does not affect the quality; simply stir well before use.

3. Material Storage: Strictly prohibited from high temperature exposure. If the drum cover is opened, seal it immediately after use; be cautious of freezing at 0℃.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

17666668815