1. Constructing up to 4-5 stories high in one setup, the structure can then be climbed layer by layer as each level is constructed.
2. Fast lifting speed. It takes only 30 to 40 minutes to lift one level, meeting the protective needs of structural construction (3 layers per day) and decoration construction (2 layers per day).
3. Enhanced safety: Utilizes multi-attachment to building facades, features multiple horizontal protections, keeping operators within the safety perimeter of the structure, effectively preventing falling debris strikes and personnel falls.
4. Compared to the landing frame, it saves 75% of materials and over 40% in costs.
5. The overall cost of scaffolding has been reduced by over 50%.


