How is the installation process for the wave guardrail?_News Center Co., Ltd._Guangxi Nanning Laries Metal Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Service Hotline
18878870277

Guangxi Nanning Laries Metal Products Co., Ltd.

Specializes in the production of wave-shaped gu...


News Category
  • No Category

Contact Information
  • 联系人:梁宵
  • 电话:18878870277
  • 手机:18878870277
News Center Co., Ltd.
How is the installation process for the wave guardrail?
Publish Time:2024-03-01        View Count:57        Return to List

The construction procedure for assembling integral reinforced concrete ribbed panels for collision barriers is as follows:

Drive steel piles at the designed spacing and depth, ensuring the depth and verticality meet the design specifications.

(2) Binding steel bars for columns

(3) Install prefabricated ribbed panels, and to ensure the wall is smooth and aesthetically pleasing, there must be marked lines on the ground before installation.

(4) Binding reinforcement bars for the beam caps

(5) The entire collision barrier is interconnected into a single unit through the pouring of concrete for the steel pipes, pillars, and overhead beams.



b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18878870277

Back to Top