Linear Drainage Channel Manufacturer_SupplyPro Co., Ltd._Jiangsu Lanting Engineering Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Jiangsu Lanting Engineering Materials Co., Ltd.

Stainless steel drain covers, stainless steel grating pan...

Consultation Hotline
17888139500

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Linear Drainage Channel Manufacturer
Linear Drainage Channel Manufacturer
品牌: Landing鼎
Specs: Inquire with Customer Service
Is Importing: No
Origin: Jiangsu
单价: 120.00/Set
最小起订Quantity: 1 Set
供货总Quantity: 999 Set
有效期至: 长期有效
最后更新: 2022-01-25 11:26
 
详细Info

Linear Drainage Channel

Material: SMC resin fiberglass

Bowl Sizes: U100/U150/U200/U250/U300

Sink Length: One meter section

Matching Lid: Stainless steel lid, with side seams, middle seam, and dual drainage; Lid Material: 201/304 Stainless Steel

1) Linear Drainage Channel

2) No bricklaying required, easy installation; can install 100 meters in a day. U-shaped drainage quick and no waterlogging, no need for slope; long lifespan and durable.

3) Smooth surface with an artistic appearance, easy to maintain and care for.

4) Materials are environmentally friendly with no adverse effects on the environment, categorizing them as green and eco-friendly materials.

5) Acid and alkali resistant, corrosion proof, bending and compressive strength up to 2-3 times that of cement products, frost-thaw resistant, permeation resistant, long lifespan, smooth surface, and maintenance-free.

Applicable Range: Commercial Plazas, Residential Areas, Pedestrian Walkways, Kitchens, Household Use, Landscape Decoration Projects

Our company offers a complete range of resin finished gap drain sizes, as listed below:

Contractors and design units can select the required size based on the drainage capacity.

Please call for details on the wide range of sizes; custom orders supported.

Product Showcase:

Factory Showcase:

How to install a linear drain:

1. Determine the trench excavation dimensions

The trench excavation dimensions are determined based on the finished trench's outer diameter and load-bearing requirements. The higher the load-bearing grade, the thicker the concrete requirements at the S and H positions.

 

2. Concrete Structure

The concrete structure in Section H, based on load-bearing requirements: for low load-bearing requirements, a 30-50mm thick cushion layer can be directly applied, with brick added on top. If conditions are not met, concrete can be used directly. For Section S, the thickness of 30-50mm is determined specifically based on the local geographical environment. When the load-bearing grade reaches E600-F900 (suitable for heavy trucks), Section H requires the use of 8mm steel bars to form a 15cm x 15cm grid reinforcement, while Section S must be no less than 100mm.

 

3. Excavation layout

Sinks are designed with male and female slots (one protruding and one concave) for direct mating assembly. The seam treatment varies according to the specific environmental conditions.

A. Indoor: Generally requires waterproofing treatment; apply a layer of waterproofing at positions S and H, and seal the sink joints with adhesive (waterproof adhesive, marble adhesive, structural adhesive, etc. for various stone adhesives are acceptable).

B. Outdoor: Generally not treated, directly assembled; seams not treated, especially for large quantities of work.

C. If the wastewater is pollutants, it requires waterproof treatment to prevent leakage.

 

4. Linear Cover Installation:

A. The linear cover is directly placed over the sink. The square tube at the bottom of the cover is securely locked into the槽 in the middle of the sink without any additional treatment. Simply place the cover on top. If stone covering is required on the cover,砂浆 or adhesive should be applied between the stone and the cover. The砂浆 thickness is recommended to be no less than 3mm, depending on the stone thickness; thicker stone requires thicker砂浆. Adjust the砂浆 thickness according to the on-site construction.

B. The gap mouth should be positioned to sink about 3mm to facilitate drainage, but the height should not exceed the finished surface height of the ground.

 


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

17888139500