Modified asphalt bridge deck waterproofing coating, specialized waterproofing material for municipal engineering bureau_SupplyPro Co., Ltd._Guangzhou Tonggu Building Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Tonggu Building Materials Co., Ltd.

91440101MA59LWM73Q

Soule Star Diamond Member
Consultation Hotline
18520130099

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Modified asphalt bridge deck waterproofing coating, specialized waterproofing material for municipal engineering bureau
Modified asphalt bridge deck waterproofing coating, specialized waterproofing material for municipal engineering bureau
品牌: Liescher
Packaging Specifications: 50 kg
Waterproof: 0.3 MPA, non-leakage for 30 minutes
Material: Modified Asphalt
单价: 300.00/piece
最小起订Quantity: 1 piece
供货总Quantity: 100000 piece
有效期至: 长期有效
最后更新: 2023-08-21 14:46
 
详细Info

  I. Product Introduction

Dowbridge Special Modified Asphalt Bridge Deck Waterproofing Coating is a water-based waterproofing coating made by modifying rubber and resin materials in asphalt binder, which is a high polymer emulsion-based coating, combined with various functional additives.

  Scope of Use

Used for bridge waterproofing, it prevents steel corrosion caused by concrete bridge leakage, thereby extending the service life of the beam structure.

  Section 3: Product Features

Wide temperature adaptability. Does not flow at high temperatures of 140℃ to 180℃ during asphalt concrete construction and does not脆裂 under dynamic loads at low temperatures of -20℃ to -30℃.

The material solidifies into film blocks with good film flexibility. The addition of chemical additives allows the material to form a film quickly, thereby shortening the construction time for bridge waterproofing.

Strong adhesion; added penetrant and thickener in the formula enhance the paint's penetration and bonding properties, allowing the paving layer to bond with the bridge deck as a single unit.

After the construction of the waterproofing layer, the shear strength between the bridge deck and the paving layer reaches 0.5~1.0 Mpa, the base layer cracks at 2mm, but the coating membrane remains intact.

Construction operability: Cold work operations, mechanized, high degree of automation, materials are non-toxic, do not pollute the environment.

  4. Construction Method

Subgrade Treatment: New concrete has reached the design strength, surface temperature cracks and natural shrinkage cracks are basically completed. The subgrade surface must be free of loose dust, dirt, grease, and standing water, achieving a clean and dry condition.

Spray Application: Ensure all equipment is fully equipped and in good working condition. Use an imported spray gun for three coats. Before applying paint over a large area, first brush 2-3 coats on the pre-treated base with a small brush. Then, apply one coat of paint over the large area, typically within 3-6 hours (but not exceeding 24 hours), depending on the temperature. Once the paint is dry to the touch, apply the second and third coats until the desired thickness is achieved.

Product Protection: No pedestrian or vehicle traffic allowed until fully cured.

  V. Cautionary Notes

Maintenance: Natural maintenance for 24 hours, avoid pedestrian and vehicle traffic.

Construction Temperature: Ideal between 5℃-35℃. If the temperature exceeds 35℃ during summer, sprinkle some cold water for cooling, and proceed with construction once it dries.

Theoretical Consumption: When the dry film thickness is 1mm, the consumption is 1.9 kg per square meter. The coating thickness is generally around 0.5mm to 0.7mm, with a consumption of 1.6 kg per square meter.