Requirements for Construction and Completion of Breathable Plastic Running Tracks_News Center Co., Ltd._Hebei Kangjiu Sports Facilities Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Hebei Kangjiu Sports Facilities Co., Ltd.

Manufactures and sells plastic sports flooring materials, silicon PU court ma...

13292723666
 
Product Classification Co., Ltd.
  • No Category
Home > News Center Co., Ltd. > Requirements for Construction and Completion of Breathable Plastic Running Tracks
News Center Co., Ltd.
Requirements for Construction and Completion of Breathable Plastic Running Tracks
Publish Time:2022-04-24        View Count:36         Return to List

Nowadays, synthetic track surfaces are a common sports facility, loved by many, yet few are aware of the specific requirements and standards involved in their construction. What maintenance standards are necessary for the management of synthetic tracks once they are completed? Let's take a look together.

Perforated塑胶track is made using塑胶 granules, with a process similar to that of road construction. It maintains good surface uniformity and requires consistent thickness of the塑胶 layer, as well as even elasticity. During construction, accuracy can be ensured by using lines for marking. Clearly visible markers should be used to identify the four semicircular tangent points and two centers of the track field. The drainage system should be installed with good performance to prevent water accumulation after heavy rain, which can severely damage the surface of the permeable塑胶 track. It is essential to evacuate the standing water within two hours after the rain, which helps to extend the usable life of the permeable塑胶 track.

Following the completion of the breathable plastic track construction, we should implement stricter maintenance and management. It is imperative to wait approximately one week before use. New national standards for plastic tracks require adequate drainage systems, suitable for all-day use, to prevent the oxidation of harmful substances. Therefore, the plastic track must be kept clean, and sudden impacts and abrasion are prohibited. Vehicles and heavy objects are strictly forbidden on the track. Athletes must wear standardized running shoes; shoes with longer spikes are prohibited on the plastic track. Temporary loads are forbidden to prevent excessive pressure on the track. Smoking and heat sources must be kept at a distance to avoid contact with organic solvents and other contaminants. Regular water spray cleaning should be conducted, and any excess water on the surface can be wiped away with a dry cloth.

The above outlines the requirements and standards for the construction of breathable plastic tracks. After completion, these standards are necessary for maintenance and management. For more information about breathable plastic tracks, please follow our website.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13292723666

Back to Top