How to Install Tower Crane Safety Monitoring System?_News Center Co., Ltd._Anhui Juzheng Technology Co., Ltd.
Anhui Juzheng Technology Co., Ltd.

Crane Black Box, Crane Visualization, Elevator Monitoring, Dust Pollution Mon...

Consultation Hotline
15605512131

Product Categories
Home > News Center Co., Ltd. > How to Install Tower Crane Safety Monitoring System?
News Center Co., Ltd.
How to Install Tower Crane Safety Monitoring System?
Publish Time:2022-08-03        View Count:106        Return to List

Many people, like most, often find themselves puzzled by the sight of one or more cranes parallel and towering above construction sites. How exactly should such towering cranes be monitored?

Today, let's clear up some confusion. Here is a simple summary of the crane installation steps compiled by the Hunan Tower Crane Safety Monitoring System editor:

Installation Methods for Tower Crane Monitoring

Upon reaching the crane platform, first secure the other end of the safety belt to the inner guard rail of the crane. The PTZ camera is typically mounted on the side facing the construction site. To secure the PTZ camera's cross arm: thread steel strapping through the top two holes to tighten and secure it to the guard rail, and below, add a 10CM-long guide rail. Then, use wire to fasten the cross arm to the guide rail.

2. The line laying process requires the camera power cables and 220V power supply cables to be sheathed with corrugated pipes, then securely tied around the railing with cable ties or wire ties. The cables should be laid "evenly, straight, and aesthetically pleasing," with an even spacing of cable ties not exceeding 15CM.

3. Connect the line, plug the 220V municipal power into the automatic reclosing pole, and insert the ball camera power plug securely.

4. Typically, tower cranes have a control box for lighting on the lower platform, where the electrical wire can be connected to one of the fuse's lower posts. Before connecting the power, use a multimeter or a tester to check the power point. If there is no lighting control box on the lower level of the tower crane, you can also obtain power from the distribution box in the crane's operating room.