Professional Breaker Head Crew_SupplyPro Co., Ltd._Jining Shengxin Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Product Center

Company Qualification

Jining Shengxin Construction Engineering Co., Ltd.

Business Model:
Location: Shandong/Jining
Contact person:王华伟 (先生)
Mobile号码:18753770336
Company Address:105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

Professional Breaker Head Crew

SupplyPro Co., Ltd.
  • Professional Breaker Head Crew

    Hotline:18753770336

    Details Introduction

    New桩头破除法Advantages

    The advantages of this process: The concrete pile head and the main reinforcement do not bond together. After the excavation of the foundation pit, there is no need to剥离 the steel reinforcement and concrete when chiseling the pile head, significantly speeding up the chiseling process and reducing construction costs.

    (1) Convenience and Speed: Easy to operate, requires minimal auxiliary equipment, easily accepted by construction personnel, and quickly mastered.

    (2) Economic Efficiency: Reduces equipment and personnel investment, greatly enhancing the efficiency of pile head breaking and lowering construction costs.

    (3) Safety and Quality: The pile head reinforcement is protected by a PE sleeve plate. When breaking the pile head, it is easy to separate the pile head concrete from the pile head reinforcement, ensuring that the pile foundation reinforcement is not damaged, thus guaranteeing the quality of the pile foundation reinforcement.

    (4) The top surface of the pile foundation after breaking is smooth and aesthetically pleasing.



    Hydraulic pile breakers are powered by hydraulic systems, utilizing the power from excavators or hydraulic stations to break piles. They feature modular assembly and are highly efficient in breaking cast-in-place pile heads.

    Performance Features:

    1. Simple

    Modular structure, easy installation, equipped with different numbers of modules based on pile diameter.

    2. General

    The hydraulic pile breaker can be powered by the excavator or by the hydraulic station.

    3. Eco-friendly

    Full hydraulic drive, low noise, static pressure construction, without affecting the quality of the pile.

    4. Low labor costs

    Primarily operated by a single excavator driver, an additional supervisor can be provided.

    5. Safety

    Construction personnel are excavator operators; they do not directly contact the broken piles.

    Jining Shengxin Construction Engineering Co., Ltd.

    Inquiry Message
     Click submit means you agree to《Service terms》《Privacy policy》
    Contact us
    • 王华伟 (Mr.)

    • 18753770336

    • 18753770336

    • 609018831@qq.com

    • 105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

    b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

     Click submit means you agree to《Service terms》《Privacy policy》