Professionally handles nationwide broken pile construction - Skilled team_SupplyPro Co., Ltd._Jining Shengxin Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Product Center

Company Qualification

Jining Shengxin Construction Engineering Co., Ltd.

Business Model:
Location: Shandong/Jining
Contact person:王华伟 (先生)
Mobile号码:18753770336
Company Address:105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

Professionally handles nationwide broken pile construction - Skilled team

SupplyPro Co., Ltd.
  • Professionally handles nationwide broken pile construction - Skilled team

    Hotline:18753770336

    Details Introduction


    New technology for pile head removal, significant advantages

    The advantages of this process: The concrete pile head and the main reinforcement do not bond together, allowing for the quick removal of the pile head after excavation without剥离 the steel and concrete, significantly speeding up the pile head removal process and reducing construction costs.

    (1) Convenience and speed: Easy to operate, with minimal accessories, and easy for construction personnel to adopt, quickly becoming proficient in handling.

    (2) Cost-effectiveness: Reduces equipment and personnel investment, greatly improves the efficiency of pile head breaking, and lowers construction costs.

    (3) Safety and Quality: The pile head rebar is protected by a PE sleeve board, making it easy to separate the pile head concrete from the rebar during pile head removal, thus ensuring the pile foundation rebar is not damaged, guaranteeing the quality of the pile foundation rebar.

    (4) Post-pier foundation top surface smooth and aesthetically pleasing.


    Hydraulic pile breaker is driven by hydraulic power, utilizing the power from excavators or hydraulic stations to break piles. Modular in design, it efficiently breaks concrete pile caps.

    Performance Features:

    1. Simple

    Modular structure, easy installation, equipped with different numbers of modules based on pile diameter.

    2. General

    Hydraulic pile breakers can be powered by excavators or by a hydraulic power station.

    3. Eco-friendly

    Full hydraulic drive, low noise, static pressure construction, without affecting the quality of the pile.

    4. Low labor costs

    Primarily operated by a single excavator driver, an additional supervisor can be provided.

    5. Safety

    Construction personnel are excavator operators; they do not directly contact the broken piles.


    Jining Shengxin Construction Engineering Co., Ltd.

    Inquiry Message
     Click submit means you agree to《Service terms》《Privacy policy》
    Contact us
    • 王华伟 (Mr.)

    • 18753770336

    • 18753770336

    • 609018831@qq.com

    • 105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

    b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

     Click submit means you agree to《Service terms》《Privacy policy》