Soil mold spinning cutting pile cap cast-in-place construction method_News Center Co., Ltd._Jining Shengxin Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

企业资质

Jining Shengxin Construction Engineering Co., Ltd.

Business Model:
Location: Shandong/Jining
联系人:王华伟 (先生)
手机号码:18753770336
Company Address:105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

Soil mold spinning cutting pile cap cast-in-place construction method

Soil mold spinning cutting pile cap cast-in-place construction method

Soil mold spinning cutting pile cap cast-in-place construction method

2025-02-27

Process Features

Streamlined process, high efficiency, and rapid speed.

The soil mold method, utilizing mechanical backfilling followed by manual excavation, eliminates the need for removing and backfilling the soil between CFG piles after pile formation, simplifying the work procedures and enhancing construction speed; the self-developed spiral cutting pile saw is employed to cut off pile heads, reducing labor intensity for workers and significantly increasing work efficiency.

2. Easy to operate, low disturbance, high quality.

The soil mold method can avoid excessive disturbance to the soil between piles below the design plane of the pile cap due to soil removal and pile head removal operations, solving issues such as broken piles and poor backfill quality caused by mechanical excavation operations. The innovative idea of the spiral cutting pile cutting mechanism allows for convenient operation in the confined soil mold space, addressing the problem that conventional pile cutting machines cannot operate within the soil mold and using jackhammers to remove pile heads is time-consuming and labor-intensive, with poor aesthetics and a higher risk of damaging the pile body.

3. Advanced technology, convenient construction, and easy promotion. The construction processes for site hardening, pile cap soil mold excavation, and saw cutting of piles by the pile cutting machine are easy to master. The allocation of construction organization elements is also easy to achieve, which is conducive to promotion.

4. The equipment is ingeniously designed, cost-effective, and yields substantial benefits. The independently developed桩截断机构 features intricate design, simple structure, easily accessible parts, and low manufacturing costs, allowing for in-house production, effectively reducing equipment investment costs, and delivering significant social and economic benefits.


The above introduces the construction method of soil mold spinning cutting pile cap casting. If you have any further questions, feel free to consult our website, where professionals will be on hand to explain.


Jining Shengxin Construction Engineering Co., Ltd.

Inquiry Message
 Click submit means you agree to《Service terms》《Privacy policy》
Contact us
  • 王华伟 (Mr.)

  • 18753770336

  • 18753770336

  • 609018831@qq.com

  • 105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》