Concrete Slab Cutting Techniques_News Center Co., Ltd._Jining Shengxin Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

企业资质

Jining Shengxin Construction Engineering Co., Ltd.

Business Model:
Location: Shandong/Jining
联系人:王华伟 (先生)
手机号码:18753770336
Company Address:105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

Concrete Slab Cutting Techniques

Concrete Slab Cutting Techniques

Concrete Slab Cutting Techniques

2025-02-27

Cut the concrete blocks in sections, no larger than 500 kg each, and then unload them onto the floor below or the ground level.

(2) Based on the design drawings, the cutting area was determined. First, the required cutting edges were marked on the floor slab using ink lines. Then, the size of the floor slab sections was decided according to the lifting equipment, approximately 1.5m x 1.5m.

(2) Clean up and clear the cutting area, including the removal of ground buildings and decorative waste, as well as various pipelines that affect cutting (such as ventilation pipes, electrical conduits, and rainwater pipes).

(3) The perimeter of the slab is cut using a flat-push electric cutting machine, while the central section is fixed to the cutting surface with expansion bolts to accommodate the track of a small cutting machine, enabling segmented cutting.

(4) Prior to the floor cutting of the main structure, a truss-type lifting crane is made from H-beams, which is then securely fastened to the beams.

Four evenly spaced holes are drilled on the sections of the building to be cut, with steel wire ropes threaded through. The ropes are then attached to the hooks of two hand winches, and the concrete cutting sections are lifted onto the hoisting frame.

Tighten the hand winch to ensure full tension.

(6) Utilizing reinforced concrete cutting machines, with specialized personnel on-site to oversee the construction process.

After cutting, two hand-cranked winches are used to gently hoist the cut floorboards and lower them safely to the lower level or ground floor.


Above is the introduction to the concrete slab cutting methods. If you have any further questions, feel free to consult our website, where professionals will be available to explain.


Jining Shengxin Construction Engineering Co., Ltd.

Inquiry Message
 Click submit means you agree to《Service terms》《Privacy policy》
Contact us
  • 王华伟 (Mr.)

  • 18753770336

  • 18753770336

  • 609018831@qq.com

  • 105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》