Shenyang Custom Cabinet Factory Shares 8 Easy Steps for Custom Cabinet Making_News Center Co., Ltd._Liaoning Jimei Sheng Aluminum Industry Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Liaoning Jimei Sheng Aluminum Industry Co., Ltd.

Furniture manufacturing, furniture sales, furniture installation and repair services, door and window manufacturing and processing, door and window sales

服务咨询热线
13332468678

News Category
  • No Category


Company Information

Liaoning Jimei Sheng Aluminum Industry Co., Ltd.

Location:Liaoning Province, Shenyang City, Liaozhong District, 147 meters southwest of Panwu Highway, Shiwai Taoyuan

Shop Level:VIP

Business Model:Manufacturer, Service Provider

Business Card

Liaoning Jimei Sheng Aluminum Industry Co., Ltd.

  • 联系人:杨吉明
  • 电话:13332468678
  • 手机:13332468678
  • 地址:Liaoning Province, Shenyang City, Liaozhong District, 147 meters southwest of Panwu Highway, Shiwai Taoyuan
新闻中心
Shenyang Custom Cabinet Factory Shares 8 Easy Steps for Custom Cabinet Making
Publish Time:2024-02-26        View Count:106         Return to List

Customization is a popular choice for home renovations. Custom cabinets not only meet the health and environmental needs of the kitchen but also save the remaining functionality and space, making them the top choice for trendy Shenyang cabinets. Generally speaking, what are the usual processes involved in customizing Shenyang cabinets?


Process One: Order Signing


After thoroughly understanding the market and having a clear understanding of the product quality, service, strength, and style of various cabinet manufacturers, once a manufacturer is confirmed, an order must be signed and a deposit of 100 to 300 yuan is required. This deposit will be returned upon the signing of the contract.


Process Two: Reservation Time


After placing an order, customers may request a measurement designer to visit for on-site measurement. Since designing a kitchen is a task, hiring an experienced designer can achieve twice the result with half the effort.


Step Three: Design the Kitchen


Customers, measurement designers, and home renovation company's construction staff must collectively plan the kitchen layout, confirming the placement of plumbing, electrical, and appliance connections. The measurement designer should provide plumbing and electrical diagrams that align with construction standards.


Step Four: Design Cabinetry


Once the water, electrical, and tile work are completed, the measurements ensure a seamless overall kitchen fit. Note: 1. Check if there is sufficient space in the cooking, washing, storage, and preparation areas. 2. Verify if the cabinet height and countertop height are ergonomically suitable for human use and cooking needs. 3. Ensure that the space outside of the Shenyang cabinets meets normal operational requirements.


Process Five: Contract Signing


Upon approval of the design scheme, a supply contract must be signed. Customers should carefully analyze each term and clause of the contract.


Process Six: Delivery and Installation


Shenyang cabinets typically offer free delivery and installation. The manufacturer schedules the delivery in advance, adhering to the agreed-upon time in the contract.


Process Seven: Inspection Check


The entire cabinet set is inspected, and electrical appliances are tested according to the manufacturer's promises and relevant standards. Full payment is due upon passing the inspection.


Process Eight: After-Sales Service


Kitchens, as a comprehensive space integrating water, electricity, and gas, place a high priority on after-sales service. It's crucial to clearly specify the warranty periods promised by the manufacturer and the response time limits for customer issues in the contract. Should the manufacturer fail to address the problems in a timely manner, this serves as a constraint on their actions.



 Click submit means you agree to《Service terms》《Privacy policy》