Flowmeter installation with pressure port_SupplyPro Co., Ltd._Jiangsu Jinming Building Installation Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Jiangsu Jinming Building Installation Engineering Co., Ltd.

Pressure Vessel Boring, Pressure Seal, Pressure Plug

Consultation Hotline
18936298877

News Center Co., Ltd.
  • No News

Product Categories
Home > SupplyPro Co., Ltd. > Flowmeter installation with pressure port
Flowmeter installation with pressure port
品牌: Jinming
Brand: Jinming
Construction Type: Flowmeter installation with pressure tap
Equipment: Hole Punching Machines, Sealing Devices, and Lower Sealing Plugs
单价: 245.00/Next
最小起订Quantity: 1 Next
供货总Quantity: 120 Next
有效期至: 长期有效
最后更新: 2023-03-02 09:05
 
详细Info

Pipe pressure maintenance hole plugging can complete pipe replacement, relocation, and valve replacement without interrupting the continuous transport of pipeline media. It also allows for rapid repair of the affected section in case of pipeline leaks.

When performing pressure bollarding during pipeline drilling, what preventive measures should be taken to address sealing construction issues?

1. To prevent equipment leakage, it's necessary to inspect the integrity of the sealing parts on the equipment before making any holes.

2. To prevent the hole cutter from scratching or leaking pipe fittings during pressure-filled hole plugging, align the pipe fittings during welding.

3. To prevent the pipe from being pierced during pressure-bearing hole sealing, ensure accurate sizing during the hole construction.

4. To prevent the gasket from being improperly placed or from having debris on it when tightened against the flange, which can lead to leakage at the sealing area after the center drill passes through. Ensure the gasket is properly positioned and remove any debris from the gasket and flange during installation.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

18936298877