What Preparations Are Needed Before Making Billboards?_News Center Co., Ltd._Guangzhou Menghao Advertising Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
  
News Category
  • No Category

Contact Information
  • 联系人:章莉苹
  • 电话:15918411835
  • 邮件:750235295@qq.com
  • 手机:15918411835


Company Information

Location:Guangdong/Guangzhou

Shop Level: VIP

Business Model:Manufacturer, Service Provider

地址:105 Hejiao Road, Tianhe District, Guangzhou (Menghao Advertising)

联系方式: 15918411835

Business Card

Guangzhou Menghao Advertising Co., Ltd.

  • 联系人:章莉苹 (女士) 
  • 电话:15918411835
  • 手机:15918411835
  • 地址:105 Hejiao Road, Tianhe District, Guangzhou (Menghao Advertising)
Home > News Center Co., Ltd. > What Preparations Are Needed Before Making Billboards?
News Center Co., Ltd.
What Preparations Are Needed Before Making Billboards?
Publish Time:2024-01-24        View Count:32         Return to List

CommonBillboard ProductionFoundation engineering accidents are often caused by the following reasons: insufficient bearing capacity of the foundation leading to instability; excessively soft soil in the foundation, which, after long-term negative stress, causes the foundation to tilt; changes in the surrounding geological environment, leading to expansion or contraction deformation of the foundation soil; loose or damaged supports of wall-mounted billboards; uneven settlement of building billboards due to external factors (including strong winds, rough construction, etc.). The occurrence of foundation engineering accidents is mainly due to improper surveying, design, construction, or changes in the operating environment. After the instability of the foundation is observed, it is necessary to promptly reinforce and correct the outdoor billboard foundation. Before determining the implementation plan, what preparatory work needs to be done? Below, the editor provides a brief introduction.

Be prepared to conduct the following investigations:

(1) Investigate the soil and hydrological conditions of the foundation location area.

(2) Review original documents to understand the foundation form and load-bearing conditions of the billboard, as well as its design load capacity.

Inspect the quality of construction materials used during billboard installation, the weather conditions during the construction period, and the overall construction quality of the billboard.

(4) Investigate changes in the surrounding environment during the use of billboards, such as the construction of municipal facilities, the commencement of nearby building projects, fluctuations in groundwater levels, and changes in ground drainage systems. Understanding the root cause of instability in the foundation of outdoor billboards enables the development of effective reinforcement and correction measures.

There are several main methods for reinforcing the foundations of outdoor billboards:

Trench Excavation Method: Directly pour concrete after digging a pit under the foundation to be replaced.

(2) Base Expansion Method: By setting concrete or reinforced concrete encasements, the area of the base at the bottom of the billboard is increased, altering the base due to...Billboard ManufacturingInadequate uniform settlement of the foundation due to a small base area and insufficient bearing capacity.

(3) Pile Replacement Method: A method of reinforcing the foundation by setting static pressure piles, driven piles, cast-in-situ piles, and various other types of piles beneath or on the sides of the billboard's foundation.

(4) Grouting Replacement Method: Uniformly inject a chemical grout into the foundation, using these grouts to bond and solidify the originally loose soil or cracks, thereby enhancing the bearing capacity of the foundation and providing waterproofing and anti-seepage effects. Correction involves manually reversing the tilt of a tilted foundation to achieve the purpose of correcting the tilt of outdoor billboards.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15918411835