Fire-resistant and explosion-proof walls are a special type of construction material, primarily used to prevent the occurrence of fires and accidents. Here is the installation process:
1. Determine Placement and Dimensions: Prior to construction, measure the wall positioning lines, the distance of the switch boxes from the ground, and other parameters as required by the design drawings. Then, mark the central cross control points and proceed with the layout according to relevant specifications to complete the preliminary preparations.
2. Conducted initial cleaning and preparation of the plastering layer; selected appropriate materials based on the actual conditions of the construction site and the specifics of the project, mixed them, and laid the chosen lightweight boards vertically. Then, used adhesive to level and reinforce the joints (note: make the joints diagonal). Next, laid a metal mesh inside the formwork and began to mix砂浆, filling it into the grid for better reinforcement later. If wooden studs are used, cover them with flame-retardant material externally to ensure safety standards are met and no pollution sources are created. Once the curtain rod is installed above the window opening for easy subsequent operations, the next step can be initiated! Of course, the specific steps will vary depending on the situation. 3. Inspection and Acceptance: During the inspection, pay attention to the following aspects: ① Check if the wiring is properly installed; ② Ensure doors and windows operate normally; ③ Look for any leakage in the bathroom, etc. These issues need to be addressed promptly to avoid affecting the living experience.