Fire-resistant and explosion-proof walls are a specialized type of construction material, primarily used to prevent fires and accidents. Here is the installation process:
Establish location and dimensions: Prior to construction, measure wall positioning lines and switch box ground distances according to the design drawings, then mark the central cross control points, and proceed with layout processing as per relevant specifications to complete the preliminary preparation.
2. Conducted preliminary cleaning and preparation of the plastering layer; selected appropriate materials based on the actual conditions of the construction site and the specifics of the project, mixed them, and laid the selected lightweight boards vertically. Then, used adhesive to level and reinforce the joints (note: creating diagonal surfaces at the seams). Subsequently, laid a metal mesh inside the formwork and began to mix砂浆 (mortar) to fill the grid for better reinforcement later. If wooden studs are used, cover them with fire-retardant material to ensure safety standards are met and no pollution sources are created. Once the curtain rod is installed above the window opening for ease of subsequent operations, the next step can be initiated! Of course, the specific steps will vary depending on the situation. 3. Inspection and Acceptance: During the inspection, pay attention to the following aspects: ① whether the wiring is properly inserted; ② if the doors and windows operate normally; ③ if there are any leakage issues in the bathroom, etc. These issues need to be addressed promptly to avoid affecting the living experience.
News Center Co., Ltd.