Which grouting material is better for winter construction?_供应产品_Beijing Huaxia RunDa Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Huaxia RunDa Technology Co., Ltd.

Manufacturing of new building materials (excluding hazardous chemicals); manu...

Soule Star Diamond Member
Consultation Hotline
13911725246

联系方式
  • Contact person:孙玉新
  • Telephone:13911725246
  • Mobile:13911725246

Product Categories
  • No Category
Home > 供应产品 > Which grouting material is better for winter construction?
Which grouting material is better for winter construction?
品牌: Huaxia RunDa
Item Number: Complete
Origin: Beijing
Measurement Unit: 1. Please provide the Chinese content to be translated.
单价: 100.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 10000 ton
有效期至: 长期有效
最后更新: 2023-05-16 10:44
 
详细Info

Which grouting material is better for winter construction?
Runda Grouting Material answers: Early-strength grouting material is more suitable for winter construction, as it achieves faster rise in strength.
What is the suitable temperature range? Can it be used at -5 to -10 degrees Celsius?
No issues with construction at temperatures ranging from -5 to -10 degrees Celsius. There's also a support grouting material that can set within two hours when applied during winter.
Actually, it's fine even below -20 degrees; to be conservative, within -10 degrees.
Can concrete anti-freezing agent be added?
There's absolutely no need to add concrete anti-freezing agents. Adding them will damage the material's inherent structure and performance, leading to a decrease in strength.
How many types of grouting materials are available for winter construction?
General, Reinforced, Super-fine, Ultra-early strength, Ultra-fluidity, Support Type
Generally used for winter construction, the support type and ultra-early strength type, i.e., CGM-4.
Will the water freeze before it solidifies?
The grouting material will not produce heat after hydration, so it will not freeze and can be used with confidence.
Construction and Maintenance Tips: 1. Prefer to perform construction on hot days. 2. Use warm water to mix during construction (20-30°C). 3. Implement heating measures, such as covering with cotton blankets, using iodine tungsten lamps, and applying open flame, etc.
Do well on the above three points, and even regular grouting material will work great.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13911725246