Many schools are planning to construct their synthetic tracks during the winter break, but many synthetic track construction companies will claim that it's not feasible to build them due to the low temperatures, which can affect the quality of the synthetic track. So, at what temperature is synthetic track construction generally carried out?
We all know that some materials for塑胶跑道 are in liquid form, such as塑胶跑道 adhesive and塑胶跑道 PU. If the temperature is too low, the塑胶跑道 cannot be constructed.
Plastic Track Manufacturers Offer Insight: Generally, plastic track construction is possible above 0 degrees Celsius, but the ideal temperature is above 10 degrees. If construction is carried out below 0 degrees, the project timeline will be significantly extended, and the quality of the plastic track may deteriorate. Therefore, it is recommended that plastic track construction not be undertaken in regions with cold winters.
Plastic Track Winter Construction Formula
Pre-construction preparations
Firstly, inspect all equipment and tools to ensure they are complete and the electrical installations are safe. Test the mechanical parts and prepare all electrical and fire prevention measures. Assign the project tasks and ensure the engineering work is divided among individuals, clearly explaining the importance of each engineering aspect and the precautions to be taken during production. Once the preparations are complete, the construction can commence.
Objective: To ensure the entire construction process is carried out safely, maintaining construction quality while striving to minimize costs and shorten the construction timeline as much as possible.
2. Technical Preparation
Upon receiving the construction plan, it is essential to promptly organize technical staff to familiarize themselves with and master the contents of the drawings. Relevant personnel from the construction unit should conduct a review of the drawings to address related matters and measures in advance. Organize on-site measurements for construction technicians to ensure the best construction plan and finalize the color效果图 of the surface layer. After that, arrange the work processes reasonably. Propose specifications, quantities, quality requirements, and delivery times for main materials. Prepare a corresponding material requisition plan. Allocate construction personnel reasonably and organize them to enter the site in a timely manner.