Why is it crucial to pay special attention to waterproofing during the construction of a塑胶track? This is because塑胶tracks are made of polyurethane plastic material, which can exhibit localized bubbling and peeling when exposed to water, leading to uncontrolled density loss in the base layer of the track.
If the compactness of the plastic track is not strictly controlled, it may lead to peeling and delamination due to the uneven compaction of the asphalt base layer. The surface of the plastic track may vaporize, and in severe cases, it could even cause the base layer to be pulled apart. Therefore, proper waterproofing measures must be taken during the construction of the plastic track.
Specifically, the measures to be taken by the construction personnel include, but are not limited to:
During construction, plastic sheets should be on hand. In case of sudden water exposure, work should be halted immediately and the newly laid plastic surfaces covered to ensure no quality issues.
Stay updated on weather forecasts, such as ensuring ground surface temperatures are between 15-45 degrees during construction, and opt for clear, fog-free conditions with lower relative humidity.
3. Besides preventing rain, the sweat of construction workers can also affect the curing of the plastic track adhesive. Therefore, workers constructing the plastic track should prepare sweat towels in advance when working in high-temperature environments.
4. It is advisable to avoid applying adhesive in the morning and during other times when ground moisture is high.
In summary, during the construction process, workers should arrange each procedure strictly and reasonably to ensure the reliability of the construction quality.



