Corrosion-resistant pile pipe, double-sided submerged arc welded, Q235B steel sleeve, one-stop supply for convenience

价      格电议

最小起订0 ton库存99999 ton

Location
Guangdong Foshan
有效期至
长期有效
最后更新
2024-06-21 11:18
View Count
77

Business Card

  • Your company's名称Foshan Shunde Langyao Steel Co., Ltd.
  • 联 系 人黄先生 (先生)
  • Your company'sPhone18128752496
  • Mobile号码18128752496
  • Company Address53 Shida Road, Guangdong Steel World Avenue, Lecong Town, Shunde District, Foshan City, Guangdong Province

买家正在看

猜你喜欢
Steel Coils, Piling Steel Casing, Steel Coils, Piling Steel Casing, Negotiable Supplying spiral steel pipes for Supplying spiral steel pipes for Negotiable Factory supplier of large diamete Factory supplier of large diamete Negotiable Large Diameter Spiral Steel Pipe, Large Diameter Spiral Steel Pipe, Negotiable Meizhou City large diameter spira Meizhou City large diameter spira ¥3200.00/ton Shantou City Anti-corrosion Spira Shantou City Anti-corrosion Spira ¥3200.00/ton Stainless Steel Spiral Pipe Whole Stainless Steel Spiral Pipe Whole ¥3200.00/ton Double-Sided Submerged Arc Welded Double-Sided Submerged Arc Welded Negotiable Large Diameter Q235B Spiral Pipe Large Diameter Q235B Spiral Pipe Negotiable Q345B Spiral Pipe Manufacturer Wh Q345B Spiral Pipe Manufacturer Wh Negotiable
Product Details

Steel casing is a common construction material that not only serves as a protective measure but also stabilizes the borehole wall and prevents collapse. Langyao Steel offers you high-quality anti-corrosion pile casing with double-sided submerged arc welding, Q235B steel casing, providing one-stop supply for your peace of mind and confidence.


Brand: Lvyao Steel

Alias: Heavy-Wall Steel Pipe

Purpose: Stabilizes the bore wall, prevents collapse

Origin: Foshan, Guangdong

Delivery Service: Available for delivery to factory

Product Surface: Plastic Coating Corrosion Protection Treatment

Steel casing construction process:

  1. Measure and determine the construction hole location.

  2. Clean bore walls to ensure a smooth and clean surface.

  3. Cut the LongYao Steel Q235B steel casings to the required length.

  4. Place the cut steel casing into the hole.

  5. Employing an electric welder for double-sided submerged arc welding to ensure a secure connection.

  6. Inspect焊接 joints for completeness, ensuring there are no hidden or missed welds.

Construction Precautions:

  • Prior to steel casing installation, the hole walls must be cleaned to ensure a tight fit of the steel casing.

  • Welding equipment suitable for construction must be used to ensure welding quality.

  • Prior to double-sided submerged arc welding, ensure the welding circuit is in good condition to prevent quality issues with the weld.

  • After welding, inspect the weld joints to ensure they are firmly secured.

The application scenarios of steel casing are very extensive, such as:

  • For foundation pit support and underground construction projects.

  • Used for pile foundation construction, it enhances the stability and load-bearing capacity of the piles.

  • Well construction for hydraulic and power projects.

Through the anti-corrosion pile pipes provided by Langyao Steel, with double-sided submerged arc welding and Q235B steel casings, you can achieve stable and reliable construction results. Regardless of the construction field you need, we offer one-stop supply services, saving you the trouble.

Learn more about our steel casing products; please contact our sales team.

Steel casing sections are transported to the construction platform by trucks and lifted and placed next to the桩drilling location using truck-mounted cranes. Submersion is achieved with crawler cranes. For longer steel casings, they cannot be lowered in one go and require a second connection during the lowering process. Before the second connection, the steel casing should be trial-assembled on site to ensure the joint meets the on-site suspended connection requirements.

1. The steel casing sinking utilizes a guide frame for guidance. The design of the positioning guide frame should be simple, sturdy, and practical. During manufacturing, ensure the welding height and quality. Generally, there will be ellipticity in the steel casing production. Leave a gap of 3 to 5 cm between the guide wood and the casing. During sinking, use hard wood wedges to adjust the verticality of the steel casing.

2. Steel casing sinking is carried out using crawler cranes and vibration hammers for vibration sinking, ensuring the steel casing is driven into the rock surface.

3. When installing a vibrator at the top of the steel casing, ensure the position is moderate to avoid misalignment that could cause the steel casing to tilt.

4. During the steel casing sinking process, it is necessary to frequently monitor the verticality of the steel casing centerline and the inclination of the casing mouth plane using measuring instruments or a plumb bob, in order to adjust the verticality of the steel casing in real-time.

5. The steel casing shall sink with an inclination not exceeding 1%, and the centering error on the plane shall not exceed 50mm.

6. When encountering difficulty in the下沉 of steel casing, do not force vibration to prevent deformation of the casing or cracking of the welds. Identify the cause and take appropriate measures before sinking again.

7. After the steel casing is submerged to the predetermined depth, check the entire steel casing for vertical alignment and center position displacement using the central buoyant marker method.

8. Secure the well casing in place on the work platform to prevent it from sliding or tilting in the event of a collapse.

The steel casing is driven using a vibration hammer. Once the steel casing is lowered into position, it is sunk by the combined efforts of the crawler crane and the vibration hammer. When the penetration rate for the last two minutes is less than 3 cm, it is considered to have reached the maximum vibration force, indicating the completion of the steel casing driving. The next steel casing can then be driven.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》


电话咨询

咨询电话:
18128752496