With the rapid development of urban construction, the application of reinforced concrete cement pipes has become increasingly widespread. They are used for drainage and sewage, longitudinal and transverse drainage on highways, as well as for water supply pipes in special factories and mines and agricultural well drilling. They are also used as protective casings for laying pipelines underground for water supply, electricity, telecommunications, gas, and other utilities. Given their broad range of applications, it is evident that the proper use of reinforced concrete cement pipes is crucial. Below, we will discuss how cement pipe manufacturers are promoting the correct usage of these pipes.
Before use, check all parts for proper functioning. Confirm that all hoses are securely connected.
2. Always adhere strictly to the specifications in the main parameters during use. Avoid overloading, and do not continue to press down after reaching the stroke limit. Otherwise, severe oil leakage at the top of the cylinder may occur when the lifting height or tonnage exceeds the regulations.
3. If the oil level in the pump body is insufficient, it is necessary to first add working oil (32# hydraulic oil) to the pump before it can operate.
4. Please refer to the user manual for the electric pump.
5. Choose a center of gravity that is moderate, and properly select the fulcrum point of the electric jack. Ensure the base is leveled, and consider the ground's hardness and softness. Determine if a sturdy wood pad is needed for support, and check for stability to prevent sinking or tilting under the load.
6. After an electric jack lifts a heavy object, it should be promptly supported securely with a stabilizing device. The electric jack is strictly prohibited from being used as a support.
News Center Co., Ltd.




