Caution for using shelving pipes
1. Regularly remove accumulated materials, bricks, concrete blocks, and other debris from the hazardous areas of the scaffold tubes; and impose restrictions on the materials stacked on the scaffold tubes to prevent overloading.
2. Regularly inspect the overall or partial structure of the shelf tubes for any deviations, especially at the connection points where signs of loosening or tilting may occur. If any abnormalities are detected, they should be promptly repaired and reinforced.
3. Inspect the tension of the rope securing the root of the dense mesh netting, as well as the bamboo matting laid down and the binding points of the bamboo matting for any signs of broken strands. If any breaks or loose areas are found, they should be replaced promptly.
![]()




