Yichun steel structure factory building inspection price_SupplyPro Co., Ltd._Shanghai Tongce Inspection & Testing Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shanghai Tongce Inspection & Testing Technology Co., Ltd.

Engaging in technological development, transfer, consultation, and service in...

Soule Star Diamond Member
Consultation Hotline
400-6899562  18616336280

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Yichun steel structure factory building inspection price
Yichun steel structure factory building inspection price
品牌: Concrete testing
Service Area: Yichun
Report Time: As per the terms of the contract
Industry Type: Structural Steel Factory Inspection
单价: 22.00/square meters
最小起订Quantity: 1000 square meters
供货总Quantity: 9999 square meters
有效期至: 长期有效
最后更新: 2023-02-27 16:37
 
详细Info

Ensure scientific inspection and assessment of the damage to steel structures post-fire. So, what inspections are necessary for steel structure components post-fire?

1. Structural Steel Component Aesthetics Inspection

Inspect the appearance of the main steel structural components on-site, observing for any signs of coating peeling or deformation and bending.

2. Component Deformation Measurement

Steel column lateral movement is measured using a theodolite, and beam deflection is measured using a total station.

3. Component Mechanical Property Testing

Samples of components damaged in the fire were randomly selected on-site and brought back to the lab for mechanical property testing to determine if they meet the mechanical property standards.

4. Structural Calculations and Component Verification

Based on on-site measurements and design drawings, the main structure model of the factory building was constructed, taking into account dead loads, live loads, wind loads, snow loads, and seismic loads, and it was verified and checked.

5. Authentication & Rating

Based on the post-fire structural steel inspection results, a mechanical analysis of the fire-resistant capacity of steel components was conducted, and a specific grading process was initiated for the post-fire steel components.

6. Provide main identification conclusions, promptly formulate post-disaster handling plans for damaged components, repair the main structures in the affected areas, and ensure fire prevention measures are in place during subsequent use.