Oil Drum Welding Machine_SupplyPro Co., Ltd._Dongguang Feiyu Special Welding Equipment Factory 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Dongguang Feiyu Special Welding Equipment Factor

Spot welders, butt welders, seam welders, array welders, ...

15131741262
 

Product Categories

Contact Information
  • Contact person:陈臣
  • Telephone:15131741262
  • Mobile:15131741262
  • Address:Hebei Dongguang County, Baobei Industrial Park
Home > SupplyPro Co., Ltd. > Oil Drum Welding Machine
Oil Drum Welding Machine
品牌: Feiyu
Are Custom Orders Available?: Is
Can we make a sample for part testing?: Available
Warranty: One year
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2023-09-07 16:12
 
详细Info

Heater Roll Welding Machine Operation Instructions

1、 Working Voltage: Three-phaseAC380V +10% ,50Hz + 1%。

2、 Work Environment:No frost from 0 to 45°C, humidity ≤ 85% without condensation droplets.

3、 Maintenance: Add lubricating conductive grease per shift3 times; clean the water circulation filter daily; clean the water tank sediment every 3 days; change the water every 20 days; use pure water for cooling in summer and antifreeze fluid in winter; replace the transmission gear oil once a month; dust collection and cleaning daily.

4、 Operation Method: After selecting the processing specification, the welder automatically applies pressure, rotates, welds, and stops upon closing the foot pedal switch. To stop the operation, simply open the foot pedal switch, which will deactivate all actions.

5、 Work must be conducted with a spark protection device to prevent personal injury.

6、 Welding machines generate high temperatures, causing the conductive copper wheels to wear over time. If the copper wheels deform, accumulate weld slag, or need to be replaced, it should be corrected or replaced promptly during use.

7、 Cooling Machine Operating Voltage: Three-phase, four-wireAC380V + 10% ,50Hz + 1%。

8、 Chiller operating normally during operationPerform R134a refrigerant topping up every 3 months.

9、 Extended downtime, please drain the water from the water-cooled machine to ensure it remains dry.

10、 High Pressure Gauge Less Than2.6mpa。

11、 Low rolling gauge0.2mpa。

12、 In case of other emergencies, please shut off the power and contact the person in charge.

 

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

15131741262