Installation of Aluminum Alloy Eaves Gutters
One, the main components of the aluminum alloy rainwater system
a. Rain Gutter b. Rain Gutter Lock Clip c. Rain Gutter Clamp d. Rain Gutter Inside Corner e. Rain Gutter Outside Corner h. Rain Head i. Rain Pipe j. Rain Pipe Connector
k. Rainwater Pipe Elbow l. Rainwater Pipe Diverter m. Rainwater Pipe Locating Device n. Rainwater Slot Hanger q. Rainwater Pipe Tee Branch
Rain Gutter (Eaves Gutter) Installation:
Level the rain channel installation location, starting from the beginning to the end, and mark the line with ink.
Remove the gutter from the packaging, place it flat on the ground or scaffolding. Below the location where the gutter will be installed horizontally, use a cutting machine to cut an opening of the same size as the gutter entrance.
3. Gently place the rain barrel into the rain tank at the drainage position.
4. Install the hangers on the rainwater pond, placing them in sequence with a grip spacing of 40-45cm between adjacent hangers.
Drill holes (using a 6mm drill bit) every 40-45cm at the clip location and insert the expansion tube.
6. Place the gutters at the string line position, adjust the spacing of the "hanging rods," and then secure the hanging rods and gutters with ∮4X40 stainless steel screws.
When encountering a rainwater drain corner, the "outer angle" and "inner angle" should be connected to the "joint," and the connecting section of the rainwater drain to the rainwater drain should also be connected to the "joint."
During rainwater tank installation, to minimize leaks, glass glue and PVC glue should be applied to the locking devices, joints, and other corresponding accessories.
Section 3: Rainwater Pipe (Square Pipe) Installation
Remove the rainwater pipes from the packaging bags and place them on the ground or scaffolding.
2. Hoist the upper line hammer at the submersible water pool position, ensuring it is perpendicular to the ground. At this vertical position, select the positioning points with a good spacing (i.e., the distance between positioning tools should be between 110cm and 130cm).
Drill holes at designated points using a drill and insert the expansion tube.
4. At the location of the rain barrel, use a "drainage device" to lead the square rainwater pipe to the inside, vertically adhere to the wall, and secure it with a positioning tool to maintain spacing; fasten the drainage device on both sides with ∏3x10 stainless steel screws.
5. The rectangular pipes and joints of the drainage device are connected using PVC glue or silicone sealant.