PE Water Supply & Drainage Pipes_SupplyPro Co., Ltd._Shandong Delingqing Pipe Industry Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Shandong Delingqing Pipe Industry Co., Ltd.

Plastic product processing and sales, plastic raw materia...

15762876333
 

Product Categories

Contact Information
  • Contact person:李经理
  • Telephone:15762876333
  • Mobile:15762876333
  • Email:zibodeerqing@163.com
  • Address:Shandong Province, Weifang Qingzhou Yangshan Economic Development Zone, East side of Liangzhou Road
Home > SupplyPro Co., Ltd. > PE Water Supply & Drainage Pipes
PE Water Supply & Drainage Pipes
品牌: Shandong Delingqing
Brand: Shandong Delingqing
Address: Qingzhou
Specs: Inquire with the manufacturer
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2024-08-06 13:58
 
详细Info

PE Water Supply and Drainage Pipe Testing Machine Method and Steps

1. After removing air from the pipe to be tested, increase the pressure to the required value at a steady rate, placing the pressure gauge as low as possible along that section of the pipe.

2. Pressure testing can be conducted before or after pipeline backfilling. The pipeline should be covered with soil at certain intervals, especially for serpentine pipelines. During pressure testing, the pipeline should be secured in its original position. The flange connection areas should be exposed for easy inspection of any leaks.

3. The test pressure for the pressure test should not exceed 1.5 times the pressure class of the PE pipe material or the component with the lowest pressure class in the system. Initially, the pressure should be raised to the specified test pressure value and held for a sufficient amount of time to ensure the pipe fully expands, which takes 2-3 hours. Once the system stabilizes, raise the pressure to 1.5 times the working pressure and hold it steady for 1 hour. Carefully observe the pressure gauge and inspect along the pipeline. If no visible leakage is observed or a significant drop in pressure occurs during the test, the pipeline passes the pressure test.

4. During the pressure test, a certain pressure drop is normal due to the continuous expansion of the pipes, which will cause a pressure drop. A pressure drop during the testing process does not necessarily prove that the pipeline system has definitely leaked or been damaged.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

15762876333