Home > News Center Co., Ltd. > Vertical Leaf Filter Composition, Structure, and Installation Matters
News Center Co., Ltd.
Vertical Leaf Filter Composition, Structure, and Installation Matters
Publish Time:2023-10-20        View Count:20         Return to List

The Vertical Leaf Filter is a type of leaf filter, as previously mentioned in the content. Therefore, it should not be difficult to understand and grasp the basic knowledge of this machine. Furthermore, based on this article, readers will gain a better understanding of this leaf filter and enhance their professional skills in this field, thereby enabling them to comprehend more extensively.

The assembly of the vertical leaf filter is an essential part, involving mainly the following content:

When machinery and equipment are transported to the assembly site, organize employees to conduct goods acceptance and verification, and compare them with the shipping list to check for any omissions.

2. Conduct inspections of machinery and equipment; following the completion of these inspections, proceed with the basic inspections.

3. The acceptance of the fundamentals, which primarily includes:

(1) Whether the base surface is level, if the horizontal error is within the specified range, and if there are any defects in the base.

(2) Does the region of the basic axis meet the prescribed requirements? Is the elevation of the foundation building accurate? If there are deviations, are they within the specified norms?

(3) Is the basic style appropriate, do the specifications meet the required standards, and are the deviations within the allowable specifications?

(4) Has the specified requirement for the compressive strength of basic concrete been met?

(5) Is the area around the foundation clean, free of dirt and standing water?

4. Is the arrival of machinery and equipment appropriate? Are the alignment and leveling of the ground floor being conducted? Are we adhering to the standard of "first rough leveling, then fine leveling"?

5. Upon completion of the equipment installation, pressure testing should be initiated, typically a pressure drop test, conducted according to the specified requirements. The working pressure must not exceed 0.4 MPa, and the duration is generally 30 minutes. If there is no leakage, then the pressure test is deemed successful and meets the standards.