Key Elements for Stainless Steel Duct Installation_News Center Co., Ltd._Shijiazhuang Changshengcheng Equipment Installation Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shijiazhuang Changshengcheng Equipment Installation Co., Ltd.

Ventilation equipment, fire protection equipment, air conditioning equipment,...

13833183335
  
News Category
  • No Category

Contact Information
  • 联系人:柳金升
  • 电话:13833183335
  • 手机:13833183335


Company Information

Location:Hebei/Shijiazhuang

Shop Level: VIP

Business Model:

地址:Shijiazhuang Qiaoxi District Binhe Street Ruijia Garden

联系方式: 13833183335

Business Card

Shijiazhuang Changshengcheng Equipment Installation Co., Ltd.

  • 联系人:柳金升 (先生) 
  • 电话:13833183335
  • 手机:13833183335
  • 地址:Shijiazhuang Qiaoxi District Binhe Street Ruijia Garden
Home > News Center Co., Ltd. > Key Elements for Stainless Steel Duct Installation
News Center Co., Ltd.
Key Elements for Stainless Steel Duct Installation
Publish Time:2024-09-12        View Count:49         Return to List

Stainless steel duct installation is a commonly used material in the industrial sector, primarily produced on the second or third production lines. After production, installation is required, and there are several key points to consider during this process. It is particularly important to note the issue of fully sealing the internal corner joints with sealant. To ensure that the 4-meter-long products (since the standard length of aluminum foil composite panels is 4 meters, many ducts will be 4 meters long) have their internal corner joints fully sealed, it is necessary to use long sealant, with a length of 2 meters, to guarantee the sealing process for products between 2 to 4 meters in length. This is a critical quality control point that must be strictly enforced. Any long products found to have unsealed corners must be reworked. When installing the stainless steel duct's connecting components, angle pads must be added at the four corners due to the internal pressure on the product walls concentrating at the duct's corner turns. When the side length is greater than 320mm, the four corners of the product no longer meet the stiffness requirements and can easily deform under external forces. Therefore, when installing rectangular ducts with a side length greater than 320mm, galvanized right-angle pads (thickness not less than 0.75mm) should be applied to the four corners of the product to increase its overall strength and rigidity. Sealing treatment is essential for the internal reinforcement of stainless steel ducts due to the low inherent strength of the product panels. Generally, zinc-plated bolt internal reinforcement is used, with bolt diameters not less than 8mm. It should be noted that if the sealing treatment is not properly addressed at the point where the bolt passes through the duct panel, it can lead to air leakage concerns during system operation. During the internal reinforcement process, it is particularly important to add washers on both sides of the pipe wall and perform sealing treatment (apply sealant) for this process, as it is often overlooked or cut corners during construction.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13833183335